PR01 | General admission

CODEUDESCRIPTIONPRICE
RE0556u

Actions under construction external control energy certification (1 UI)

Monitoring and control of external certification of energy efficiency in the execution phase of work, for checking a building finished first inspection unit, according to the document Popularity DRD 15/06 "criteria technical control external certification of energy efficiency of new buildings, "consisting of the external control program, record promoter compliance with that program prior to the start of the work, external control during the course of the execution of the work, identifying data Late work (DFO), the detection of deviations from the DEC and the issue of the external audit report, including, in If deviations from the grade calculation using the same calculation tool. Includes travel and visits.

771,15 €
RE0555u

Preliminary external control energy certification (1 UI)

Monitoring and control of external certification of energy efficiency in preliminary stage, for the verification of the technical documentation for a building project with the first inspection unit, according to the document Popularity DRD 06 / 15 "technical criteria for external control of the certification of energy efficiency of new buildings," consisting of the identification data contained in the files of the tool used for calculating the energy certification project , checking their consistency with the project execution or minimum documentation, preparation of a report by external control, where the initial data will be recorded particularized control (DIC) in an attachment called Initial Identification data control individual services for the building, as well as the conclusions on the status of energy efficiency and finally registration pursuant to promoter DIC mb the individual services. Includes the study of technical documentation.

272,81 €
RE0122u

Aids palette for the implementation of coves (20 IU)

Aid for the replacement pallet bays executed in a building with 20 units of inspection, involving the replacement of siding and paint on the affected area, size no greater than 0,50x0,50 m, without providing materials 'finished. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: auxiliary to heights exceeding 7 meters or preparation of tasting (chopped coatings, opening holes in ceilings, etc.) or unique siding replacement.

866,76 €
RE0157u

Technical advice on legal proceedings

Technical advice in the preparation of documentation of legal proceedings by filing a complaint, or ask to make another expert or similar, which involved only the expert as a consultant and not directly in the procedure, including visits and travel.

347,99 €
RE0586u

Technical advice on a topic structural construction

Technical advice, consisting of contributions not written an opinion based on a question about a topic or structural construction with a commitment not to exceed half a working day. It does not include travel.

181,87 €
RE0553u

Technical assistance for the execution of a campaign of inlets (50 IU)

Technical assistance for the execution of a campaign of beaches in a building or premises involving 50 inspection units, consisting of planning, coordination and supervision of the implementation of the coves and laboratory aids work for his replacement. Includes visits and travel.

734,47 €
RE0554u

Technical assistance for repair or refurbishment interior (1 UI)

Technical assistance for the execution of a specific repair or internal reform in a home or premises without attachment structure, facades and other elements common with the first intervention in inspection unit, consisting of planning, coordination and supervision the execution of works. Includes technical and administrative paperwork municipal, tours and travel.

543,80 €
RE0297u

Calculation and sizing of a structure (10 UI)

Calculation and sizing of a structure of wood, steel, concrete or mixed, including its foundation for a building with 10 units or local inspection, consisting of the sizing and verification of structural elements defined in a project execution, from the calculation of solicitations, stresses and deformations resulting from the implementation of the actions planned for use and the corresponding regulations. Includes floor plans, sections and details of the cutting structure, memory calculations, measurements and consulting. Not including the design of the structure, geotechnical or management or technical assistance in the implementation phase.

3.203,85 €
RE0155u

Appearance before a magistrate expert

Appearance of an expert on judicial body as a result of a subpoena in the presence of a magistrate or his representative (in hearing recognition or in situ) to answer questions or clarifications, including waiting time and visits and displacement.

347,99 €
RE0154u

Appearance of an expert body in public

Appearance of an expert on public body (judicial or administrative bodies, professional associations, etc.) to query or collect information or documents and various procedures, including visits and travel.

266,14 €
RE0557u

Notice of opening of workplace

Management and administrative processing a communication opening workplace, consisting of filing and registration of the documentation required. Not including writing technical documentation supporting.

93,56 €
RE0569u

Municipal sanitation network connection

Starting height intended for connection to the municipal sewer sanitation, according to the requirements of the Office for the Coordination of Works in Public Roads (OCOVAL) Municipal Service Coordination of Works and Maintenance Infrastructure, including replacement of pavement outside. Includes w / w of auxiliary means to complete their installation and operation.

93,56 €
RE0468u

Waste Management Coordinator at removing barriers (one elevator)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building with one elevator or local, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

349,94 €
RE0469u

Waste Management Coordinator at removing barriers (two lifts)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building with two elevators or local, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

369,88 €
RE0470u

Waste Management Coordinator at removing barriers (3 lifts)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts, according to what is 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

378,15 €
RE0471u

Waste Management Coordinator at removing barriers (4 elevators)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with 4 lifts, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

384,49 €
RE0429u

Waste Management Coordination rehabilitation building (1 UI)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

412,31 €
RE0430u

Waste Management Coordinator building rehabilitation (10 IU)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

516,51 €
RE0431u

Waste Management Coordinator building rehabilitation (20 IU)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

563,72 €
RE0432u

Waste Management Coordinator building rehabilitation (50 IU)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

655,47 €
RE0184u

Waste Management Coordination rehabilitation façade (1 UI)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or local intervention in the first inspection unit, according with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

349,94 €
RE0404u

Waste Management Coordination rehabilitation façade (10 IU)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 10 inspection units, according with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

409,77 €
RE0405u

Waste Management Coordination rehabilitation façade (20 IU)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 20 inspection units, according with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

436,87 €
RE0406u

Waste Management Coordination rehabilitation façade (50 IU)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 50 inspection units, according with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

489,56 €
RE0295u

Waste Management Coordination repair construction element (1 UI)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the repair of an item constructive intervention in the first inspection unit in accordance with the established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

266,58 €
RE0464u

Coordination safety and health at removing barriers (one elevator)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building with one elevator or local, in accordance with s' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

660,33 €
RE0465u

Coordination safety and health at removing barriers (two lifts)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building with two elevators or local, in accordance with s' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

888,59 €
RE0466u

Coordination safety and health at removing barriers (3 lifts)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

983,15 €
RE0467u

Coordination safety and health at removing barriers (4 elevators)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with 4 lifts, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.055,67 €
RE0434u

Occupational Safety and Health Coordination Building renovation (1 UI)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

660,33 €
RE0435u

Health and Safety Coordination in building rehabilitation (10 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

997,26 €
RE0436u

Health and Safety Coordination in building rehabilitation (20 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.149,88 €
RE0437u

Health and Safety Coordination in building rehabilitation (50 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.446,49 €
RE0183u

Health and Safety Coordination rehabilitation façade (1 UI)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the rehabilitation of a building facade house, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

362,06 €
RE0401u

Health and Safety Coordination rehabilitation façade (10 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 10 inspection units, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

758,65 €
RE0402u

Health and Safety Coordination rehabilitation façade (20 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 20 inspection units, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

938,28 €
RE0403u

Health and Safety Coordination rehabilitation façade (50 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 50 inspection units, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.287,41 €
RE0269u

Health and Safety Coordination repair construction element (1 UI)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the repair of an item constructive intervention in the first inspection unit, in accordance with s 'established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

355,39 €
RE0558u

Dismantling and reinstalling air conditioning unit

Dismantling of air conditioning unit or exteiror interior restoration and reinstallation and subsequent commissioning of the unit, even aid work, debris removal and loading, accessories and auxiliary.

93,56 €
RE0559u

Dismantling and reinstalling boiler, boiler or accumulator

Dismantling boiler, thermal storage or individual recovery and subsequent re-installation and commissioning, even aid, debris removal and loading, accessories and auxiliary.

93,56 €
RE0442u

Execution rehabilitation (1 UI)

Execution of the works described in implementation of rehabilitation project for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

963,76 €
RE0443u

Execution rehabilitation (10 IU)

Execution of the works described in implementation of rehabilitation project for a building or local intervention 10 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

1.779,06 €
RE0444u

Execution rehabilitation (20 IU)

Execution of the works described in implementation of rehabilitation project for a building or local intervention 20 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.173,82 €
RE0445u

Execution rehabilitation (50 IU)

Execution of the works described in implementation of rehabilitation project for a building or local intervention 50 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.941,08 €
RE0268u

Execution repair construction element (1 UI)

Execution of the works described in implementation plan for the repair of an item constructive intervention in the first inspection unit. Includes visits to work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and emission certificate end of work.

366,00 €
RE0267u

Project management in repair construction element (1 UI)

Management works described in implementation plan for the repair of an item constructive intervention in the first inspection unit. Includes visits to work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the state of the works.

366,00 €
RE0416u

Director of the rehabilitation works (1 UI)

Construction management implementation plan described in rehabilitation for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

963,76 €
RE0417u

Director of the rehabilitation works (10 IU)

Management works described in implementation plan for a building or local intervention 10 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

1.779,06 €
RE0418u

Director of the rehabilitation works (20 IU)

Management works described in implementation plan for a building or local intervention 20 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

2.173,82 €
RE0419u

Director of the rehabilitation works (50 IU)

Management works described in implementation plan for a building or local intervention 50 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

2.941,08 €
RE0447u

Project management reform and adaptation (1 UI)

Management of the works described in implementation plan for the reform and adaptation to functional and constructive intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

648,21 €
RE0181u

Project management rehabilitation cranes (1 UI)

Management of the works described in the implementation plan of rehabilitation cranes intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

648,21 €
RE0193u

Project management rehabilitation cranes (10 IU)

Management of the works described in implementation project for rehabilitation of cranes in operation 10 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

981,49 €
RE0194u

Project management rehabilitation cranes (20 IU)

Management of the works described in implementation project for rehabilitation of cranes in operation 20 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

1.132,47 €
RE0195u

Project management rehabilitation cranes (50 IU)

Management of the works described in implementation project for rehabilitation of cranes in operation 50 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

1.425,88 €
RE0452u

Project management in removing barriers (one elevator)

Management of the works described in the implementation plan for the elimination of architectural barriers in a building with one or local elevator. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

930,42 €
RE0453u

Project management in removing barriers (two lifts)

Management of the works described in the implementation plan for the elimination of architectural barriers in a building or premises with two lifts. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

1.204,30 €
RE0454u

Project management in removing barriers (3 lifts)

Management of the works described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

1.317,72 €
RE0455u

Project management in removing barriers (4 elevators)

Management of the works described in the implementation plan for the elimination of architectural barriers in a building or premises with four lifts. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

1.404,76 €
RE0270u

Project management in repair construction element (1 UI)

Management of the works described in implementation plan for the repair of an item constructive intervention in the first inspection unit. Includes visits to work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, drawing up additional documents, control of construction certificates, emission certificate of work and final drafting of the final document of the state of the works.

532,11 €
RE0568u

Removing paint prexistents

Removal by blowing paint scraper prexistents grip unable to support even within the limits of sanding debris with enough grip. Measured surface actually executed. Even loading and removal of debris. Includes auxiliary according to research health and safety.

93,56 €
RE0282u

Issuance of descriptive technical certificate for notarial registration (1 UI)

Issuance of descriptive technical certificate for registration of a notarial inspection unit, consisting of a visit to the property, review documentation and issuance of registration certificate coach. Even graphic documentation necessary drawn from the information provided by the client on the current state of the property.

378,30 €
RE0575u

Escopidora aluminum sheet lacquered

Escopidora sheet lacquered aluminum with 60 microns minimum thickness of film dry thickness of 1.5 mm with double water drip, developing 30 cm.

93,56 €
RE0460u

Study on Waste Management in removing barriers (one elevator)

Writing Study Waste Management for the works described in the implementation plan for the elimination of architectural barriers in a building with one elevator or local, in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

312,88 €
RE0461u

Study on Waste Management in removing barriers (two lifts)

Writing Study Waste Management for the works described in the implementation plan for the elimination of architectural barriers in a building with two elevators or local, in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

340,58 €
RE0462u

Study on Waste Management in removing barriers (3 lifts)

Writing Study Waste Management for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

352,06 €
RE0463u

Study on Waste Management in removing barriers (4 elevators)

Writing Study Waste Management for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with 4 lifts, in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

360,86 €
RE0425u

Study Waste Management Rehabilitation (1 UI)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

312,88 €
RE0426u

Study on Waste Management in rehabilitation (10 IU)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 10 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

387,26 €
RE0427u

Study on Waste Management in rehabilitation (20 IU)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 20 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

420,97 €
RE0428u

Study on Waste Management in rehabilitation (50 IU)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 50 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

486,44 €
RE0294u

Study on Waste Management in repair construction element (1 UI)

Writing Study Waste Management for the works described in the implementation plan for the repair of an item constructive intervention in the first inspection unit in accordance with the provisions of the Real Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

229,52 €
RE0164u

Waste Management Study for rehabilitation cranes (10 IU)

Writing Study Waste Management for the works described in the implementation plan of rehabilitation intervention cranes 10 inspection units, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

380,59 €
RE0180u

Waste Management Studio rehabilitation cranes (1 UI)

Writing Study Waste Management for the works described in the implementation plan of rehabilitation cranes intervention in the first inspection unit in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

312,88 €
RE0199u

Waste Management Studio rehabilitation cranes (20 IU)

Writing Study Waste Management for the works described in the implementation plan of rehabilitation intervention cranes 20 inspection units, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

429,51 €
RE0200u

Waste Management Studio rehabilitation cranes (50 IU)

Writing Study Waste Management for the works described in the implementation plan of rehabilitation intervention cranes 50 inspection units, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

559,80 €
RE0456u

Study of Health and Safety at removing barriers (one elevator)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building with one elevator or local, in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

432,88 €
RE0457u

Study of Health and Safety at removing barriers (two lifts)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building with two elevators or local, in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

551,21 €
RE0458u

Study of Health and Safety at removing barriers (3 lifts)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

600,21 €
RE0459u

Study of Health and Safety at removing barriers (4 elevators)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building or premises with 4 lifts, in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

637,85 €
RE0421u

Study of Safety and Health Rehabilitation (1 UI)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

387,41 €
RE0422u

Study on Safety and Health in rehabilitation (10 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

504,41 €
RE0423u

Study on Safety and Health in rehabilitation (20 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

557,40 €
RE0424u

Study on Safety and Health in rehabilitation (50 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

660,39 €
RE0179u

Study of Safety and Health Rehabilitation cranes (1 UI)

Drafting the Study of Safety and Health for the work described in the project execution rehabilitation cranes intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97, 24 October, the Ministry of the Presidency.

387,41 €
RE0196u

Study of Safety and Health Rehabilitation cranes (10 IU)

Drafting the Study of Safety and Health for the work described in the project execution rehabilitation intervention cranes 10 inspection units, according to the provisions of Royal Decree 1627/97, 24 October, the Ministry of the Presidency.

481,40 €
RE0197u

Study of Safety and Health Rehabilitation cranes (20 IU)

Drafting the Study of Safety and Health for the work described in the project execution rehabilitation intervention cranes 20 inspection units, according to the provisions of Royal Decree 1627/97, 24 October, the Ministry of the Presidency.

523,99 €
RE0198u

Study of Safety and Health Rehabilitation cranes (50 IU)

Drafting the Study of Safety and Health for the work described in the project execution rehabilitation intervention cranes 50 inspection units, according to the provisions of Royal Decree 1627/97, 24 October, the Ministry of the Presidency.

606,74 €
RE0266u

Study on Safety and Health in repair construction element (1 UI)

Drafting the Study of Safety and Health for the work described in the implementation plan for the repair of an item constructive intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

241,65 €
RE0533u

Implementation plan coves and tests in residential building (10 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 10 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of ​​the building:

14.618,80 €
RE0534u

Implementation plan coves and tests in residential building (20 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 20 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 8 units of inspection for each inspection area of ​​the building:

14.618,80 €
RE0535u

Implementation plan coves and tests in residential building (50 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 50 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 16 units of inspection for each inspection area of ​​the building:

19.403,26 €
RE0564u

Registrale ceiling plaster cracked plates with hidden profiles

Supply and installation of ceiling registrable comprising plates cracked plaster, suspended ceiling with hidden profiles, profiles comprising primary, secondary and angular finishing the ceiling fixed by galvanized steel bars. Includes Stake modular axis of the plot. Leveling and positioning of angular profiles. Rethinking the profiles of the primary plot. Signs of anchor points on the roof. Leveling suspension and primary and secondary profiles of the plot. Placement of the plates. Measurement criteria: Area between households measured in horizontal projection, according to graphic Project, undiscounted empty facilities.

93,56 €
RE0563u

Registrale ceiling made of plasterboard with smooth hidden profiles

Supply and installation of ceiling registrable constituted by gypsum plasterboard smooth 12.5 x 600 x 600 mm suspended ceiling with hidden profiles, profiles comprising primary, secondary and angular finishing the ceiling fixed by bars and hanged. Even w / w fixing accessories completely installed. Includes Stake modular axis of the plot. Leveling and positioning of angular profiles. Rethinking the profiles of the primary plot. Signs of anchor points on the roof. Leveling suspension and primary and secondary profiles of the plot. Placement of the plates. Measurement criteria: Area between households measured in horizontal projection, according to graphic Project, undiscounted empty facilities.

93,56 €
RE0283u

Management application for aid for the execution of works

Management application for aid for the execution of works by technical or administrative staff, consisting of the collection and presentation of administrative documents required before the corresponding entity on behalf of the applicant .

655,63 €
RE0584u

Installation of taking the floor of the building

Installation of taking the floor of the building, with 35 mm² copper conductor and 2 sinks.

93,56 €
RE0298u

Modeling the behavior of a structure (10 UI)

Modeling the behavior of a structure of wood, steel, concrete or mixed, including its foundation for a building with 10 units or local inspection, consisting of calculating solicitations, stresses and deformations resulting from the implementation of the actions planned for use and the corresponding regulations, based on data from a previous campaign to determine geometry, inspection and documentation cracking and deformation of the current, running creeks and laboratory tests and checking the safety factors derived from this analysis. Includes analysis of current documentation, visit calculista for technical inspection of the property (with an intensity of inspection least six inspection units), memory calculation and graphic support, conclusions and recommendations. Not including the definition, where appropriate, strengthening and maintenance of the structure, which will subject the corresponding implementation plan, or management or technical assistance in the implementation phase.

3.403,91 €
RE0579u

Cleaning cranes

Netetja cranes in regular condition through the application launches on the surface of water pressure, cold, hot or soft brush and water vapor roots. Beginning with the upper parts linearly, applying the treatment to complete horizontal stripes of 2-4 m tall, with water cleaning debris that accumulate in lower areas, affecting all elements, considering a degree of difficulty normal. If there are difficulties in the use of water will be cleaned in dry. Even jambs and moldings. Also remove all stains, salts, efflorescence SALITROSO that can be found. Measure the vertical projection surface.

93,56 €
RE0562u

Steel cross sections for functional replacement of forged

Game designed to complement the work of functional replacement of forged steel profiles embedded within the slab, involving the placement of a cross section steel 80x40x5 S-275-JR on the underside of the beam, according to the description of the project and indications of Project Management. It includes the following materials and works: 1.1 of Chopped ceramic or concrete slab, to leave enough space to accommodate longitudinal steel profiles and corresponding anchor plates. 1.2 Installation of steel profiles transversal supported on the lower wings of longitudinal profiles (or soldiers on the underside of the lower wing of longitudinal profiles, if necessary), according to the graphic documentation project prior application of double layer anticorrosive paint. The cross sections are placed in each bay so that the separation between each two profiles does not exceed 1 m. 1.3 Put U plate 3 mm thick, to facilitate the protection of the lower wing of the beam and the contact with the cross-sectional profile. 1.4.- flush the cross section so that the minimum and maximum separation between the upper wing profile and the underside of the beam to be 5 mm and 30 mm, respectively. Contact 1.5.--beam cross section by filling the steel U thixotropic mortar with controlled shrinkage, component, based on cement and synthetic resins (Sika Monotop 612 or similar). 1.6.- Entry into load beam and replacement of drilling practiced in interior partitions.

93,56 €
RE0299u

Health and Safety Plan (1 UI)

Editorial Health and Safety Plan for the works described in the Study of Health and Safety with the intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October , the Ministry of the Presidency.

218,91 €
RE0567u

Preparation of support with chipped

Preparation of the support by coating chipped existing tools or by sandblasting erosion, cleaning and filling of joints, coal, etc. mortar repair. Even removal and loading debris. Includes auxiliary according to research health and safety.

93,56 €
RE0170u

Writing supplementary report IEC Building (1 UI)

Writing supplementary report Building (IEC) of the first inspection unit, which collects the information of the building written and graphic in order to detect, identify and qualify the damages (fissures, cracks, humidities. ..) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain necessary parameters for evaluating structural drafting a plan coves of the study results and the estimating the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based on the Guidelines for the Inspection and Evaluation complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

1.372,06 €
RE0413u

Writing supplementary report building IEC (10 IU)

Writing supplementary report Building (IEC), a building with 10 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 10 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

2.589,78 €
RE0414u

Writing supplementary report building IEC (20 IU)

Writing supplementary report Building (IEC), a building with 20 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 20 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

3.338,85 €
RE0415u

Writing supplementary report building IEC (50 IU)

Writing supplementary report Building (IEC), a building with 50 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 30 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

4.646,26 €
RE0163u

Writing assessment report building IEE (1 UI)

Writing Assessment Report of buildings (IEE) of the first inspection unit, which collects information on the building and its evaluation regarding their condition, according to the conditions of accessibility regulations and the degree of energy efficiency. Includes tours and travel, visit and technical inspection of the property, making the certificate, entry in the register and obtaining energy efficiency label.

787,42 €
RE0410u

Writing assessment report building IEE (10 IU)

Writing Assessment Report of buildings (IEE), a building with 10 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes tours and travel, and visit the technical inspection of the property (with an intensity of inspection least six units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

1.317,35 €
RE0411u

Writing assessment report building IEE (20 IU)

Writing Assessment Report of buildings (IEE), a building with 20 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes tours and travel, and visit the technical inspection of the property (with a minimum intensity of inspection of 10 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

1.625,96 €
RE0412u

Writing assessment report building IEE (50 IU)

Writing Assessment Report of buildings (IEE), a building with 50 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes tours and travel, and visit the technical inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

2.187,29 €
RE0516u

Preliminary Evaluation Report Writing IEP structure (1 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of the first inspection unit, which collects information from written and graphic building with the aim of analyzing the current state the structure of the building, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes visit to the technical inspection of the property.

887,56 €
RE0517u

Preliminary Evaluation Report Writing IEP structure (10 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of a building with 10 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes visit to the technical inspection of the property (with an intensity of inspection least six inspection units).

1.452,54 €
RE0518u

Preliminary Evaluation Report Writing IEP structure (20 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of a building with 20 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes visit to the technical inspection of the property (with an intensity of at least 15 inspection inspection units).

1.943,75 €
RE0538u

Preliminary Evaluation Report Writing IEP structure (50 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of a building with 50 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes visit to the technical inspection of the property (with a minimum intensity of inspection 23 inspection units).

2.602,61 €
RE0158u

Writing report and opinion

Editorial and opinion report, consisting of the following written statement of the circumstances observed in recognition estates, buildings, documents, etc., or the consideration of the issue is considered, with explanations of technical, economic, etc. ., and the opinion on the subject matter under consideration and justified on the basis of the report.

909,37 €
RE0160u

Writing report and opinion (1 UI)

Writing report and opinion for the first inspection unit, consisting of the following written statement of the circumstances observed in recognition of the property, with technical explanations, economic, etc., and the opinion on the issue subject to consideration and justified on the basis of the report. Includes visits and travel and tour expert for the inspection of the property.

1.005,16 €
RE0151u

Editorial energy certification (1 UI)

Editorial energy certification for the first inspection unit in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for certifying the energy efficiency of buildings . Includes visit to the certifier for technical inspection of the property. inspection units, production certificate, registration in the register and obtain the energy efficiency label.

385,29 €
RE0165u

Editorial energy certification (10 IU)

Editorial energy certification for a building with 10 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes visit to the certifier for technical inspection of the property (with an intensity of inspection least six units of inspection, certification preparation, entry in the register and obtain the energy efficiency label.

839,84 €
RE0166u

Editorial energy certification (20 IU)

Editorial energy certification for a building with 20 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes visit to the certifier for technical inspection of the property (with a minimum intensity of inspection of 10 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label.

1.114,30 €
RE0167u

Editorial energy certification (50 IU)

Editorial energy certification for a building with 50 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes visit to the certifier for technical inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label.

1.609,26 €
RE0448u

Writing barrier removal project (one elevator)

Writing implementation plan for the elimination of architectural barriers in a building with one elevator, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description solution for the removal of architectural barriers. Includes tours and travel, memory document specification, budget and plans.

989,97 €
RE0449u

Writing project to eliminate barriers (two lifts)

Writing implementation plan for the elimination of architectural barriers in a building with two elevators, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description solution for the removal of architectural barriers. Includes tours and travel, memory document specification, budget and plans.

1.418,07 €
RE0450u

Writing Project removing barriers (3 lifts)

Writing implementation plan for the elimination of architectural barriers in a building with three lifts, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description solution for the removal of architectural barriers. Includes tours and travel, memory document specification, budget and plans.

1.599,43 €
RE0451u

Writing project to eliminate barriers (4 elevators)

Writing implementation plan for the elimination of architectural barriers in a building with 4 lifts, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description solution for the removal of architectural barriers. Includes tours and travel, memory document specification, budget and plans.

1.748,30 €
RE0476u

Writing project legalization (10 IU)

Writing legalization project for a building with 10 units of inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the legalization building, drafting project legalization, drafting the necessary annexes and final certificate of work. Includes visits and travel.

6.153,56 €
RE0446u

Writing project of reform and adaptation (1 UI)

Writing implementation plan for the reform and adaptation to functional and constructive intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description of solutions. Includes tours and travel, memory document specification, budget and plans.

989,97 €
RE0173u

Drafting building rehabilitation project (1 UI)

Writing rehabilitation project execution for the first inspection unit, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans.

4.226,04 €
RE0171u

Drafting building rehabilitation project (10 IU)

Writing implementation plan for building restoration or local inspection with 10 units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 10 IU).

7.285,33 €
RE0172u

Drafting building rehabilitation project (20 IU)

Writing implementation plan for a building renovation or 20 local inspection units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 20 IU).

8.887,25 €
RE0168u

Drafting building rehabilitation project (50 IU)

Writing implementation plan for a building renovation or 50 local inspection units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 30 IU).

11.838,19 €
RE0185u

Writing rehabilitation project cranes (1 UI)

Writing implementation plan for the rehabilitation of a facade with intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

989,97 €
RE0190u

Writing rehabilitation project cranes (10 IU)

Writing implementation plan for the rehabilitation of a facade with 10 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.246,84 €
RE0191u

Writing rehabilitation project cranes (20 IU)

Writing implementation plan for the rehabilitation of a facade with 20 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.363,16 €
RE0192u

Writing rehabilitation project cranes (50 IU)

Writing implementation plan for the rehabilitation of a facade with 50 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.592,74 €
RE0265u

Writing repair project construction element (1 UI)

Writing implementation plan for the repair of an item constructive intervention in the first inspection unit, consisting of technical visits for data collection, documentation of the current study and assessment of the deficiencies identified and description of repair construction element. Includes tours and travel, memory document specification, budget and plans.

989,97 €
RE0438u

Writing project management and renovation building (1 UI)

Writing project studies and project management for the renovation of a building with intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

7.926,49 €
RE0439u

Writing project management and rehabilitation of building (10 IU)

Writing project studies and project management for the renovation of a building with 10 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

13.248,91 €
RE0440u

Writing project management and rehabilitation of building (20 IU)

Writing project studies and project management for the renovation of a building with 20 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

15.926,86 €
RE0441u

Writing project management and rehabilitation of building (50 IU)

Writing project studies and project management for the renovation of a building with 50 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

20.969,16 €
RE0189u

Writing project management and rehabilitation cranes (1 UI)

Writing project studies and project management for the rehabilitation cranes intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the façade restoration project drafting, drafting Annex scaffolding, writing health and safety study, drafting of study on waste management, construction management, management of execution, coordination of health and safety, waste management and coordination. Includes visits and travel.

1.830,28 €
RE0407u

Writing project management and rehabilitation cranes (10 IU)

Writing project studies and project management for the rehabilitation intervention cranes 10 inspection units, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the façade restoration project drafting, drafting Annex scaffolding, writing health and safety study, drafting of study on waste management, construction management, management of execution, coordination of health and safety, waste management and coordination. Includes visits and travel.

2.555,25 €
RE0408u

Writing project management and rehabilitation cranes (20 IU)

Writing project studies and project management for the rehabilitation intervention cranes 20 inspection units, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the façade restoration project drafting, drafting Annex scaffolding, writing health and safety study, drafting of study on waste management, construction management, management of execution, coordination of health and safety, waste management and coordination. Includes visits and travel.

2.894,60 €
RE0409u

Writing project management and rehabilitation cranes (50 IU)

Writing project studies and project management for the rehabilitation intervention cranes 50 inspection units, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the façade restoration project drafting, drafting Annex scaffolding, writing health and safety study, drafting of study on waste management, construction management, management of execution, coordination of health and safety, waste management and coordination. Includes visits and travel.

3.577,28 €
RE0472u

Writing and project management in removing barriers (1 elevators)

Writing project studies and project management for the removal of architectural barriers in a building with one elevator, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the removal of architectural barriers, rehabilitation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, direction of the works, coordination coordination of health and safety and waste management. Includes visits and travel.

3.676,42 €
RE0473u

Writing and project management in removing barriers (two lifts)

Writing project studies and project management for the removal of architectural barriers in a building with two elevators, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the removal of architectural barriers, rehabilitation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, direction of the works, coordination coordination of health and safety and waste management. Includes visits and travel.

4.772,63 €
RE0474u

Writing and project management in removing barriers (3 lifts)

Writing project studies and project management for the removal of architectural barriers in a building with three lifts, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the removal of architectural barriers, rehabilitation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, direction of the works, coordination coordination of health and safety and waste management. Includes visits and travel.

5.230,72 €
RE0475u

Writing and project management in removing barriers (4 elevators)

Writing project studies and project management for the removal of architectural barriers in a building with 4 lifts, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the removal of architectural barriers, rehabilitation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, direction of the works, coordination coordination of health and safety and waste management. Includes visits and travel.

5.591,93 €
RE0289u

Writing project execution gas installation (20 IU)

Writing project execution gas installation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

1.158,89 €
RE0286u

Editorial electricity installation project execution (20 IU)

Writing project execution installation of electricity for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and electrotechnical Regulation for low voltage REBT (RD 842/2002). Includes memory document specification, budget and plans.

1.259,13 €
RE0288u

Writing plumbing installation project execution (20 IU)

Writing project execution plumbing and sanitation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

757,91 €
RE0290u

Editorial fire protection installation project execution (20 IU)

Writing project execution install fire protection for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

624,23 €
RE0287u

Writing project execution telecommunications installation (20 IU)

Writing project execution installation of telecommunications services for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and the Rules governing the common telecommunications infrastructure for access to telecommunication services inside buildings (Royal Decree 346/2011). Includes memory document specification, budget and plans.

1.092,04 €
RE0291u

Drafting implementation plan development (20 IU)

Writing project development and implementation of urban regeneration to an area linked to a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

1.594,04 €
RE0296u

Editorial project management and repair construction element (1 UI)

Writing project studies and project management for the repair of an item constructive intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies and detected description of repair construction element, writing project and necessary annexes, writing health and safety study, drafting of study on waste management, direction of the works, coordination of health and safety coordination waste management. Includes visits to work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, drawing up additional documents, control of construction certificates, emission certificate of work and final drafting of the final document of the state of the works.

867,90 €
RE0285u

Writing project installation thermal energy (20 IU)

Writing project execution installation of thermal energy for a building or local intervention 20 inspection units, according to the provisions of the Technical Building Code CTE ( RD 314/2006) and the Regulation of Thermal Installations in Buildings RITE (RD 1027/2007). Includes memory document specification, budget and plans.

1.426,20 €
RE0561u

Reinforcing wrought IPE-180 to 3.5 m

Functional replacement of slabs, in areas identified in plans, each consisting of reinforcing beam profiles using IPE-180 S-275-JR, according to the description of the Project and the Project Management indicacionsde, including the following materials and work: 1.1 Withdrawal furniture and protection of fixed elements (floors, doors, windows, kitchen benches, toilets, etc.). 1.2 Sanitation coatings lower the beams and brushed surface. 1.3 Perforated coatings in areas of support profiles. 1.4.- Shoring of the section of beam or joist. 1.5.- Placing plates on the beams or walls using chemical anchors or similar HILTI including aid work; size, design and operation of solar transmisióde not guarantee the bending moments in reinforced concrete beam; to this end, be submitted to the project management of a sample plate for their acceptance. 1.6.- work placement in the metal profiles, one piece each beam, upon application of a double layer of paint antioxidant, welded plate, or directly welded metal beam, when it is the case . In any case, the solution will be adjusted to the standard CTE / SE A. 1.7.- flush profile so that the minimum and maximum separation between the upper wing profile and the underside of the beam be 5mm 30 mm, respectively. 1.8.- Fastening profile plates to anchor the beams. 1.9.- contact and entry into the load beam is made by the col • Placement of filling mortar expansion control • installed. 1.10.- Replacement work on opening of tabiquería going on, to an average length of 3.50 m.

93,56 €
RE0573u

Energy refurbishment of flat roof

Energy refurbishment of flat roof cleaned and repaired prior support with good condition consesrvació membrane imperbeabilitzant. Adding insulation termoacústic protection for the eterior cover, made of insulating tile flooring floating filter Polifoam Losa '' Knauf Insulation '' or similar to 40x30x8 cm, 1.3 thermal resistance (m²k) / W. Even w / w of reconsideration, cuts, resolving thermal bridges, fixing and cleaning.

93,56 €
RE0566u

Grouting of brick facing

Grouting of brick facing existing cement mortar matching colors, even netetja back together and crushed if necessary. Includes auxiliary according to research health and safety. Measurement criteria: graphic surface as measured Project deducting the empty area greater than 0.8 m², adding to change the surface of the inside of the vacuum for the development of jambs and lintels.

93,56 €
RE0152u

Renovation of municipal license of occupation of a dwelling

Renovation of municipal license of occupation of a property, according to municipal regulations. Includes visit to the house of the technical issue of technical certificate of compliance with the conditions of habitability, processing the affidavit of renewal and application fees, and obtaining the certificate of occupancy.

512,21 €
RE0565u

Repairing damage to vertical surface

Repairing damage to vertical as a result of the work of the slab reinforcement.

93,56 €
RE0580u

Replacement parts face brick

Replacement parts face brick broken piece of the same size, color and texture, with cleaning and removal of debris and earth walk loaded. Including auxiliary according to research health and safety. Measurement criteria of the project: graphic surface as measured Project deducting the empty area greater than 0.8 m², adding to change the surface of the inside of the vacuum for the development of jambs and lintels.

93,56 €
RE0574u

Solving encounter and covered with vertical vents

Solving encounter and covered with vertical vents, consisting of the installation of side reinforcement lower 33 cm wide and 50 cm band than wide, with sheet of elastomer SBS modified bitumen, LBM (SBS) -40 / FP (140) enhanced layer of bituminous oxiasfalt, LO-30 / FV (60), seal AENOR even cavalcaments; separating layer under protection with geotextile polyester fibers (200 g / m²) and laying flooring tile consisting of type '' aspe '' 12 x24 cm, redirecting pending, with its corresponding base layer of mortar, finally even w / w of filling expansion joints with mastic asphalt cord, forming gutters with ceramic tile leaky, minvells and other special reinforcement bands, and cavalcaments losses.

93,56 €
RE0577u

Removed useless patio

Starting height intended for cleaning patios, dismantled cables, pipes and other elements insesrvibles even fasteners with debris removal and loading without use.

93,56 €
RE0576u

Wiring and removal of foreign objects in front

Starting height intended for assembling and wiring ducts useless, advertising signs and other items unrelated to the original composition of the facade, including fasteners, with debris removal and loading without use. Dismantling and reposisció electricity and telecommunications facilities, if necessary.

93,56 €
RE0578u

Withdrawal awning in front

Withdrawal awning in front consisting of anchors and supports dismantling a wall with use and subsequent relocation, including all tasks necessary for proper operation. Measuring unit actually executed by inspection units.

93,56 €
RE0161u

Review and analysis of technical documentation

Review and analysis of technical documentation (reports, opinions, laboratory studies, measurements and budgets, assessments, reports, plans, specifications, order books, studies and safety plans, structural calculations, planning documents, etc. ) with a medium level of complexity.

181,87 €
RE0571u

Replacing pump

Replacing existing connection to pump sewage, including mains connection. Completely installed and running.

93,56 €
RE0570u

Replacement of drinking water connection

Starting height intended to replace drinking water connection in accordance with the rules and regulations of the municipal utility company, including replacement of pavement outside. Includes w / w of auxiliary means to complete their installation and operation.

93,56 €
RE0583u

Replacing blind and, where applicable, reconstruction lintel

Replacing blind consisting drawer removal and demolition of the existing shutter elements needed; if necessary, reconstruction of the threshold by two rows of empty tile 4 cm with a steel rod diameter 12 mm; supply and installation of aluminum drawer 165 mm Silver A1650 woven aluminum thermal mud 41 mm, ivory approximately 1500 x 1500 mm, folding dustpan gray or white tape 16 mm. Final cleaning included cutting and removal of debris landfill.

93,56 €
RE0585u

Replacing door balcony

Balcony door of a folding blade, made of anodized aluminum with 15 micron quality seal EWAA-channel Euras European gasket sealing inner corners of the ring Sella and accessories that guarantee its correct operation, finished in natural color glazing to receive up to 33 mm, received directly in an empty building 90 x 210 cm by anchor pins arranged every 50 cm and less than 25 cm from corners taken with cement mortar, even redesign, positioning, leveling and plumbing, installation and regulation, sealed by silicone perimeter and cleaning, according to NTE-FCL

93,56 €
RE0182u

Appraisal and valuation of real estate building, land or premises (1 UI)

Appraisal and real estate valuation for the first inspection unit, consisting of the writing assessment report and supporting, independent or complementary to another report or opinion. Includes tours and travel, visit expert for inspection of the property, market research, analysis of current legislation on the date of valuation, preparation of graphic documentation necessary assessment and report writing.

511,11 €
RE0560u

Treatment capillary moisture in existing factories

Treatment capillary moisture existing factories in average thickness of 15 cm, 10 cm by conducting drilling perpendicular to the base of the wall, placing injection nozzles, sealing surface drilling mortar cement and lime M-2.5 and waterproof grout injection, based on potassium silicate and potassium methyl silicone, filling drilling fluid cement mortar, coating and waterproofing cementitious mortar kitchenware, resins and selected aggregates.

93,56 €
RE0582u

Treatment and painting existing metalwork

Treatment metalwork existing on the outside and inside, consisting of cleaning and sanding imperfections, application of antioxidant coat of paint and enamel layer. Including review and sanitation anchors closures and replacement parts in disrepair.

93,56 €
RE0581u

Treatment protection locksmith

Locksmith existing treatment consisting of cleaning and sanding imperfections, application of antioxidant coat of paint and enamel layer. Including review and sanitation anchors closures and replacement parts in disrepair.

93,56 €
RE0162u

Economic valuation report or opinion for

Economic valuation justified repair diseases, deficiencies amendment, etc., as an inseparable part of an expert opinion, which complements. Considering a maximum of six items valued with or without decomposition.

227,34 €
RE0156u

Further reconnaissance, inspection or face intervention

Further recognition or inspection of facilities, buildings, injuries, creeks, land, plots, urban development, etc., or any other intervention in person by a technician. Includes travel and, where appropriate, descriptive record of emission.

166,11 €