PR01 | General admission

CODEUDESCRIPTIONPRICE
RE0122u

Aids palette for the execution of tasting (20 IU)

Aid for the replacement of masonry tasting executed in a building with 20 units of inspection, involving the replacement of siding and paint on the affected area, size no greater than 0,50x0,50 m, without providing materials 'finished. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: auxiliary to heights exceeding 7 meters or preparation of tasting (chopped coatings, opening holes in ceilings, etc.) or unique siding replacement.

860,09 €
RE0157u

Technical advice on legal proceedings (distance <20 km)

Technical advice in the preparation of documentation of legal proceedings by filing a complaint, or ask to make another expert or similar, which involved only the expert as a consultant and not directly in the proceedings, including travel at a maximum distance of 20 km.

212,96 €
RE0553u

Technical assistance for the execution of a campaign of inlets (50 IU)

Technical assistance for the execution of a campaign in a building with 50 bays inspection units, consisting of planning, coordination and supervision of the implementation of the coves laboratory work and aid for his replacement. Includes shift a maximum distance of 20 km.

596,47 €
RE0155u

Appearance before a magistrate expert (distance <20 km)

Appearance of an expert on judicial body as a result of a subpoena in the presence of a magistrate or his representative (in hearing recognition or in situ) to answer questions or clarifications, including waiting time and travel a maximum distance of 20 km.

212,96 €
RE0154u

Appearance of an expert on public body (distance <20 km)

Appearance of an expert on public body (judicial or administrative bodies, professional associations, etc.) to query or collect information or documents and various steps, including going to a maximum distance of 20 km.

131,75 €
RE0269u

Health and Safety Coordination

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the repair of a structural element in a unit inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

219,88 €
RE0468u

Waste Management Coordination removal of barriers (one elevator)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with one elevator plurifamilar, in according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

347,24 €
RE0469u

Waste Management Coordination removal of barriers (two lifts)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with two elevators, of according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

367,04 €
RE0470u

Waste Management Coordination removal of barriers (3 lifts)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with 3 lifts plurifamilar, in according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

375,24 €
RE0471u

Waste Management Coordination removal of barriers (4 elevators)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with 4 lifts plurifamilar, in according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

381,53 €
RE0404u

Waste Management Coordination facade rehabilitation (10 IU)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the rehabilitation of a building facade plurifamilar involving 10 units inspection in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

406,61 €
RE0405u

Waste Management Coordination facade rehabilitation (20 IU)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the rehabilitation of a building facade plurifamilar involving 20 units inspection in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

433,51 €
RE0406u

Waste Management Coordination facade rehabilitation (50 IU)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the rehabilitation of a building facade plurifamilar involving 50 units inspection in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

485,79 €
RE0184u

Waste Management Coordination facade renovation building house

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works described in the implementation plan for the rehabilitation of a building facade house, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

347,24 €
RE0429u

Waste Management Coordination comprehensive rehabilitation (1 UI)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the project implementation of comprehensive rehabilitation for the first inspection unit in accordance with the provisions of the Real Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

310,47 €
RE0430u

Waste Management Coordination comprehensive rehabilitation (10 IU)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 10, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

384,28 €
RE0431u

Waste Management Coordination comprehensive rehabilitation (20 IU)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 20, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

417,73 €
RE0432u

Waste Management Coordination comprehensive rehabilitation (50 IU)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 50, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

482,70 €
RE0464u

Health and Safety Coordination removal of barriers (one elevator)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with one elevator plurifamilar, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

655,25 €
RE0465u

Health and Safety Coordination removal of barriers (two lifts)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with two elevators, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

881,74 €
RE0466u

Health and Safety Coordination of removing barriers (3 lifts)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with three lifts, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

975,58 €
RE0467u

Health and Safety Coordination removal of barriers (4 elevators)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with 4 lifts plurifamilar, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.047,54 €
RE0401u

Health and Safety Coordination rehabilitation façade (10 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the rehabilitation of plurifamilar facade of a building with 10 units in operation inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

752,81 €
RE0402u

Health and Safety Coordination rehabilitation façade (20 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the rehabilitation of plurifamilar facade of a building with 20 units in operation inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

931,06 €
RE0403u

Health and Safety Coordination rehabilitation façade (50 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the rehabilitation of plurifamilar facade of a building with 50 units in operation inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.277,50 €
RE0183u

Health and Safety Coordination house facade renovation

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the rehabilitation of a building facade house, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

359,27 €
RE0434u

Health and Safety Coordination comprehensive rehabilitation (1 UI)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the project implementation of comprehensive rehabilitation for the first inspection unit, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

655,25 €
RE0435u

Health and Safety Coordination comprehensive rehabilitation (10 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or building with 10 local inspection units, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

989,58 €
RE0436u

Health and Safety Coordination comprehensive rehabilitation (20 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or building with 20 local inspection units, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.141,02 €
RE0437u

Health and Safety Coordination comprehensive rehabilitation (50 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or building with 50 local inspection units, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.435,35 €
RE0268u

Execution

Work for the location of execution of the works carried out in execution project for the repair of a structural element in a unit inspection. Includes visits to work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and emission certificate end of work.

230,40 €
RE0442u

Execution of comprehensive rehabilitation (1 UI)

Execution of the works carried out in execution of comprehensive rehabilitation project for the first inspection unit. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

956,34 €
RE0443u

Execution of comprehensive rehabilitation (10 IU)

Execution of the works carried out in execution of comprehensive rehabilitation project for a building with 10 units or local inspection. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

1.765,36 €
RE0444u

Execution of comprehensive rehabilitation (20 IU)

Execution of the works carried out in execution of comprehensive rehabilitation project for a building with 20 units or local inspection. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.157,08 €
RE0445u

Execution of comprehensive rehabilitation (50 IU)

Execution of the works carried out in execution of comprehensive rehabilitation project for a building with 50 units or local inspection. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.918,43 €
RE0267u

Construction management

Work for the location of the works carried out in execution project for the repair of a structural element in a unit inspection. Includes visits to work, drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the state of works .

230,40 €
RE0416u

Construction management of comprehensive rehabilitation (1 UI)

Construction management developed in project implementation of comprehensive rehabilitation for the first inspection unit. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, issuing the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

956,34 €
RE0417u

Construction management of comprehensive rehabilitation (10 IU)

Construction management in developed implementation plan for building 10 units or local inspection. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, issuing the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

1.765,36 €
RE0418u

Construction management of comprehensive rehabilitation (20 IU)

Construction management in developed implementation plan for a building or local inspection units 20. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, issuing the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

2.157,08 €
RE0419u

Construction management of comprehensive rehabilitation (50 IU)

Construction management in developed implementation plan for a building or local inspection units 50. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, issuing the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

2.918,43 €
RE0452u

Project management to eliminate barriers on building (first lifts)

Work for the location of the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with one elevator. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the project work , containing the final state of the works.

923,25 €
RE0453u

Project management to eliminate barriers on building (2 elevators)

Work for the location of the works carried out in the implementation plan for the elimination of architectural barriers in a building with two plurifamilar lift. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the project work , containing the final state of the works.

1.195,02 €
RE0454u

Project management to eliminate barriers on building (3 lifts)

Work for the location of the works carried out in the implementation plan for the elimination of architectural barriers in a building with three plurifamilar lift. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the project work , containing the final state of the works.

1.307,58 €
RE0455u

Project management to eliminate barriers on building (4 elevators)

Work for the location of the works carried out in the implementation plan for the elimination of architectural barriers in a building with four plurifamilar lift. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the project work , containing the final state of the works.

1.393,95 €
RE0270u

Management of the works

Work for the location of the works carried out in execution project for the repair of a structural element in a unit inspection. Includes visits to work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, preparation of additional documents that may be required to detail any element work, control of construction certificates, Issuance of the final certificate of work and drafting of the final document of the state of the works.

395,24 €
RE0193u

Project management rehabilitation cranes (10 IU)

Work for the location of the works carried out in execution project for the rehabilitation of plurifamilar facade of a building with 10 units in operation inspection. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the project work , containing the final state of the works.

973,93 €
RE0194u

Project management rehabilitation cranes (20 IU)

Work for the location of the works carried out in execution project for the rehabilitation of plurifamilar facade of a building with 20 units in operation inspection. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the project work , containing the final state of the works.

1.123,75 €
RE0195u

Project management rehabilitation cranes (50 IU)

Work for the location of the works carried out in execution project for the rehabilitation of plurifamilar facade of a building with 50 units in operation inspection. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the project work , containing the final state of the works.

1.414,90 €
RE0181u

Project management rehabilitation of housing front

Work for the location of the works carried out in the implementation plan for the rehabilitation of the facade of a house. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the project work , containing the final state of the works.

643,22 €
RE0282u

Issuance of descriptive technical certificate for notarial registration (1 UI)

Issuance of descriptive technical certificate for registration of a notarial inspection unit, consisting of a visit to the property, review documentation and issuance of registration certificate coach. Even graphic documentation necessary drawn from the information provided by the client on the current state of the property.

333,28 €
RE0266u

Basic Health and Safety Study

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for the repair of a structural element in a unit inspection in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

107,01 €
RE0460u

Study Waste Management elimination barriers (one elevator)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the elimination of architectural barriers in a building with one elevator plurifamilar, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

310,47 €
RE0461u

Study Waste Management elimination barriers (two lifts)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with two elevators, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

337,96 €
RE0462u

Study Waste Management elimination barriers (3 lifts)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with three lifts, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

349,35 €
RE0463u

Study Waste Management elimination barriers (4 elevators)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the elimination of architectural barriers in a building with 4 lifts plurifamilar, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

358,08 €
RE0199u

Waste Management Studio rehabilitation cranes (20 IU)

Writing Study Waste Management for the works described in the implementation plan for the rehabilitation of plurifamilar facade of a building with 20 units in operation inspection, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

426,20 €
RE0200u

Waste Management Studio rehabilitation cranes (50 IU)

Writing Study Waste Management for the works described in the implementation plan for the rehabilitation of plurifamilar facade of a building with 50 units in operation inspection, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

555,49 €
RE0180u

Study Waste Management crane rehabilitation (housing)

Writing Study Waste Management for the works described in the implementation plan for the rehabilitation of the facade of a house in accordance with the provisions of Royal Decree 105/2008, of 1 in February 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

310,47 €
RE0425u

Study Waste Management comprehensive rehabilitation (1 UI)

Work relating to the drafting of the Study of Waste Management for the works carried out in the project implementation of comprehensive rehabilitation for the first inspection unit in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

310,47 €
RE0426u

Study Waste Management comprehensive rehabilitation (10 IU)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 10, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

384,28 €
RE0427u

Study Waste Management comprehensive rehabilitation (20 IU)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 20, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

417,73 €
RE0428u

Study Waste Management comprehensive rehabilitation (50 IU)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 50, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

482,70 €
RE0456u

Study of Safety and Health removing barriers (one elevator)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for the elimination of architectural barriers in a building with one elevator plurifamilar, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

429,54 €
RE0457u

Study of Safety and Health removing barriers (two lifts)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with two elevators, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

546,96 €
RE0458u

Study of Safety and Health removing barriers (3 lifts)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with three lifts, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

595,59 €
RE0196u

Study of Safety and Health Rehabilitation cranes (10 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan for the rehabilitation of plurifamilar facade of a building with 10 units in operation inspection, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

477,70 €
RE0197u

Study of Safety and Health Rehabilitation cranes (20 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan for the rehabilitation of plurifamilar facade of a building with 20 units in operation inspection, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

519,95 €
RE0198u

Study of Safety and Health Rehabilitation cranes (50 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan for the rehabilitation of plurifamilar facade of a building with 50 units in operation inspection, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

602,07 €
RE0179u

Study of Safety and Health Rehabilitation front of a house

Drafting the Study of Safety and Health for the work described in the implementation plan for the rehabilitation of the facade of a house in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

384,42 €
RE0421u

Health and Safety Study of comprehensive rehabilitation (1 UI)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the project implementation of comprehensive rehabilitation for the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

384,42 €
RE0422u

Health and Safety Study of comprehensive rehabilitation (10 IU)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 10, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

500,53 €
RE0423u

Health and Safety Study of comprehensive rehabilitation (20 IU)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 20, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

553,11 €
RE0424u

Health and Safety Study of comprehensive rehabilitation (50 IU)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 50, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

655,31 €
RE0533u

Implementation plan coves and tests in residential building (10 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 10 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of ​​the building:

14.241,52 €
RE0534u

Implementation plan coves and tests in residential building (20 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 20 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 8 units of inspection for each inspection area of ​​the building:

14.241,52 €
RE0535u

Implementation plan coves and tests in residential building (50 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 50 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 16 units of inspection for each inspection area of ​​the building:

18.989,14 €
RE0283

Management application for aid for the execution of works

Management application for aid for the execution of works by technical or administrative staff, consisting of the collection and presentation of administrative documents required before the corresponding entity on behalf of the applicant .

518,23 €
RE0472u

Fee removal of technical barriers on building (one elevator)

For technical work for the elimination of architectural barriers on a building with one elevator. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the elimination of architectural barriers, rehabilitation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, direction of the works, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

3.680,59 €
RE0473u

Fee removal of technical barriers on building (2 elevators)

For technical work for the elimination of architectural barriers on a building with two elevators. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the elimination of architectural barriers, rehabilitation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, direction of the works, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

4.768,36 €
RE0474u

Fee removal of technical barriers on building (3 lifts)

For technical work for the elimination of architectural barriers on a building with three lifts. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the elimination of architectural barriers, rehabilitation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, direction of the works, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

5.226,01 €
RE0475u

Fee removal of technical barriers on buildings (4 lifts)

For technical work for the elimination of architectural barriers on a building with 4 elevators. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the elimination of architectural barriers, rehabilitation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, direction of the works, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

5.584,43 €
RE0189u

Fee technical rehabilitation façade (housing)

Technical work for the rehabilitation and facade of a house. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the façade restoration project drafting, drafting Annex scaffolding writing study health and safety, preparation of study on waste management, construction management, performance management, coordination of health and safety, waste management and coordination. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

1.835,68 €
RE0407u

Fee technical rehabilitation of cranes (10 IU)

Technical work for the restoration of a facade with 10 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the façade restoration project drafting, drafting Annex scaffolding writing study health and safety, preparation of study on waste management, construction management, performance management, coordination of health and safety, waste management and coordination. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

2.555,07 €
RE0408u

Fee technical rehabilitation of cranes (20 IU)

Technical work for the restoration of a facade with 20 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the façade restoration project drafting, drafting Annex scaffolding writing study health and safety, preparation of study on waste management, construction management, performance management, coordination of health and safety, waste management and coordination. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

2.891,81 €
RE0409u

Fee technical rehabilitation of cranes (50 IU)

Technical work for the restoration of a facade with 50 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the façade restoration project drafting, drafting Annex scaffolding writing study health and safety, preparation of study on waste management, construction management, performance management, coordination of health and safety, waste management and coordination. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

3.571,09 €
RE0438u

Fees integral rehabilitation technicians (1 UI)

Technical work for the complete renovation of the first inspection unit. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, construction management, performance management, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

8.056,17 €
RE0439u

Fees integral rehabilitation technicians (10 IU)

Technical work for the complete renovation of a building with 10 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, construction management, performance management, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

13.688,70 €
RE0440u

Fees integral rehabilitation technicians (20 IU)

Technical work for the complete renovation of a building with 20 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, construction management, performance management, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

16.505,08 €
RE0441u

Fees integral rehabilitation technicians (50 IU)

Technical work for the complete renovation of a building with 50 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, construction management, performance management, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

21.672,74 €
RE0476u

Technical fees for the legalization of a building (10 IU)

Technical work for the legalization of a building with 10 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the legalization of the building, drafting project legalization, drafting the necessary annexes and certificate end of work. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

6.395,55 €
RE0169u

Inspection and diagnosis of coves executed

Work inspection and diagnosis by a competent technician, coves executed to establish the origin of the existing conditions. Includes visit of the technical building inspection performed coves and Issuance of descriptive record the results of the inspection.

255,07 €
RE0178u

Data acquisition and leverage current state (1 UI)

Work relating to data collection and the current rise for the first inspection unit. It includes the preparation of plans current.

297,41 €
RE0164u

Preparation of Waste Management Study for rehabilitation cranes (10 IU)

Writing Study Waste Management for the works described in the implementation plan for the rehabilitation of plurifamilar facade of a building with 10 units in operation inspection, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

377,66 €
RE0170u

Writing Supplementary Report of building (1 UI)

Writing supplementary report Building (IEC) of the first inspection unit, which collects the information of the building written and graphic in order to detect, identify and qualify the damages (fissures, cracks, humidities. ..) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain necessary parameters for evaluating structural drafting a plan coves of the study results and the estimating the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based on the Guidelines for the Inspection and Evaluation complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

1.361,49 €
RE0413u

Writing supplementary report building IEC (10 IU)

Writing supplementary report Building (IEC), a building with 10 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 10 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

2.569,83 €
RE0415u

Writing supplementary report building IEC (50 IU)

Writing supplementary report Building (IEC), a building with 50 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 30 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

4.478,13 €
RE0163u

Writing assessment report building (1 UI)

Writing Assessment Report of buildings (IEE) of the first inspection unit, which collects information on the building and its evaluation regarding their condition, according to the conditions of accessibility regulations and the degree of energy efficiency. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property, making the certificate, entry in the register and obtain the energy efficiency label.

649,00 €
RE0410u

Writing assessment report building IEE (10 IU)

Writing Assessment Report of buildings (IEE), a building with 10 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property (with an intensity of inspection least six units of inspection, certification preparation, entry in the register and obtaining the energy efficiency label.

1.174,86 €
RE0411u

Writing assessment report building IEE (20 IU)

Writing Assessment Report of buildings (IEE), a building with 20 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property (with a minimum intensity of inspection of 10 units of inspection, certification preparation, entry in the register and obtaining the energy efficiency label.

1.481,09 €
RE0412u

Writing assessment report building IEE (50 IU)

Writing Assessment Report of buildings (IEE), a building with 50 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtaining the energy efficiency label.

2.038,09 €
RE0158u

Writing report and opinion

Editorial and opinion report, consisting of the following written statement of the circumstances observed in recognition estates, buildings, documents, etc., or the consideration of the issue is considered, with explanations of technical, economic, etc. ., and the opinion on the subject matter under consideration and justified on the basis of the report.

902,37 €
RE0160u

Writing report and opinion (1 UI)

Writing report and opinion for the first inspection unit, consisting of the following written statement of the circumstances observed in recognition of the property, with technical explanations, economic, etc., and the opinion on the issue subject to consideration and justified on the basis of the report. Includes: displacement in a metropolitan area to a maximum distance of 20 km and visit for expert inspection of the property.

1.029,90 €
RE0151u

Editorial energy certification (1 UI)

Editorial energy certification for the first inspection unit in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for certifying the energy efficiency of buildings . Includes shift a maximum distance of 20 km, visit technical certifier for inspection of the property, making the certificate, entry in the register and obtain the energy efficiency label.

249,97 €
RE0165u

Editorial energy certification (10 IU)

Editorial energy certification for a building with 10 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes shift a maximum distance of 20 km, visit technical certifier for inspection of the property (with an intensity of inspection least six units of inspection, certification preparation, entry in the register and obtaining the energy efficiency label.

701,03 €
RE0166u

Editorial energy certification (20 IU)

Editorial energy certification for a building with 20 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes shift a maximum distance of 20 km, visit technical certifier for inspection of the property (with a minimum intensity of inspection of 10 units of inspection, certification preparation, entry in the register and obtaining the energy efficiency label.

973,37 €
RE0167u

Editorial energy certification (50 IU)

Editorial energy certification for a building with 50 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes shift a maximum distance of 20 km, visit technical certifier for inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtaining the energy efficiency label.

1.464,52 €
RE0516u

Writing the evaluation report preliminary structure IEP (1 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of the first inspection unit, which collects information from written and graphic building with the aim of analyzing the state current structure of the building, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property.

748,38 €
RE0517u

Writing the evaluation report preliminary structure IEP (10 IU)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP), a building with 10 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property (with an intensity of inspection least six inspection units).

1.309,01 €
RE0518u

Writing the evaluation report preliminary structure IEP (20 IU)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP), a building with 20 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property (with an intensity of at least 15 inspection inspection units).

1.796,43 €
RE0538u

Writing the evaluation report preliminary structure IEP (50 IU)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP), a building with 50 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property (with a minimum intensity of inspection 23 inspection units).

2.450,22 €
RE0448u

Writing project on removing barriers building (one elevator)

Writing implementation plan for the elimination of architectural barriers on a building with one elevator. Consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes shift a maximum distance of 20 km, memory document specification, budget and all necessary plans in order to put into action the works.

1.014,84 €
RE0449u

Writing project on removing barriers building (2 elevators)

Writing implementation plan for the elimination of architectural barriers on a building with two elevators. Consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes shift a maximum distance of 20 km, memory document specification, budget and all necessary plans in order to put into action the works.

1.439,64 €
RE0450u

Writing removal project on building barriers (3 lifts)

Writing implementation plan for the elimination of architectural barriers on a building with three lifts. Consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes shift a maximum distance of 20 km, memory document specification, budget and all necessary plans in order to put into action the works.

1.622,67 €
RE0451u

Writing removal project on building barriers (4 elevators)

Writing implementation plan for the elimination of architectural barriers on a building with 4 elevators. Consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes shift a maximum distance of 20 km, memory document specification, budget and all necessary plans in order to put into action the works.

1.770,41 €
RE0446u

Writing barrier removal project on housing

Writing implementation plan for the elimination of architectural barriers to housing. Consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes shift a maximum distance of 20 km, visit technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.014,84 €
RE0447u

Writing barrier removal project on housing

Writing implementation plan for the elimination of architectural barriers on a home. Consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes shift a maximum distance of 20 km, memory document specification, budget and all necessary plans in order to put into action the works.

1.014,84 €
RE0286u

Writing project execution installation of electricity (20 IU)

Writing project execution installation of electricity for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314/2006) and electrotechnical Regulation for low voltage REBT (RD 842/2002). Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.281,92 €
RE0288u

Writing project execution plumbing and sanitation (20 IU)

Writing project execution plumbing and sanitation for a building or local inspection units 20, in accordance with the provisions of the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

784,56 €
RE0289u

Writing project execution gas installation (20 IU)

Writing project execution gas installation for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314 / 2006) and specific regulations. Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.182,45 €
RE0290u

Writing project execution install fire protection (20 IU)

Writing project execution install fire protection for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

651,91 €
RE0287u

Writing project execution installation of telecommunications services (20 IU)

Writing project execution installation of telecommunications services for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314/2006) and the Rules governing the common telecommunications infrastructure for access to telecommunication services inside buildings (Royal Decree 346/2011). Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.116,12 €
RE0291u

Writing project development and implementation of urban regeneration (20 IU)

Writing project development and implementation of urban regeneration to an area linked to a building or local inspection units 20, in accordance with the provisions of the Technical Building Code CTE ( RD 314/2006) and specific regulations. Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.615,60 €
RE0285u

Writing project to install thermal energy (20 IU)

Writing project execution installation of thermal energy for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314 / 2006) and the Regulation of Thermal Installations in Buildings RITE (RD 1027/2007). Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.447,70 €
RE0173u

Drafting building rehabilitation project (1 UI)

Writing implementation plan for the first inspection unit, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and approach of the work aimed at repairing pathologies detected in structure, roofing, façades and facilities. Includes shift a maximum distance of 20 km, the expert visit for inspection of the property, the report document specification, budget and plans.

4.482,87 €
RE0171u

Drafting building rehabilitation project (10 IU)

Writing implementation plan for a building with 10 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes shift a maximum distance of 20 km, the expert visit for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 10 IU).

7.899,30 €
RE0172u

Drafting building rehabilitation project (20 IU)

Writing implementation plan for a building with 20 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes shift a maximum distance of 20 km, the expert visit for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 20 IU).

9.661,34 €
RE0168u

Drafting building rehabilitation project (50 IU)

Writing implementation plan for a building with 50 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes shift a maximum distance of 20 km, the expert visit for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 30 IU).

12.779,82 €
RE0190u

Writing rehabilitation project cranes (10 IU)

Writing implementation plan for the rehabilitation of a facade with 10 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes shift a maximum distance of 20 km, visit technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.269,72 €
RE0191u

Writing rehabilitation project cranes (20 IU)

Writing implementation plan for the rehabilitation of a facade with 20 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes shift a maximum distance of 20 km, visit technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.385,15 €
RE0192u

Writing rehabilitation project cranes (50 IU)

Writing implementation plan for the rehabilitation of a facade with 50 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes shift a maximum distance of 20 km, visit technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.616,07 €
RE0185u

Writing facade rehabilitation project (housing)

Writing implementation plan for the first inspection unit. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes shift a maximum distance of 20 km, visit technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.014,84 €
RE0152u

Renovation of municipal license of occupation of a dwelling

Renovation of municipal license of occupation of a property, according to municipal regulations. Includes visit to the house of the technical issue of technical certificate of compliance with the conditions of habitability, processing the affidavit of renewal and application fees, and obtaining the certificate of occupancy.

375,92 €
RE0161u

Review and analysis of technical documentation

Review and analysis of technical documentation (reports, opinions, laboratory studies, measurements and budgets, assessments, reports, plans, specifications, order books, studies and safety plans, structural calculations, planning documents, etc. ) with a medium level of complexity.

180,47 €
RE0162u

Economic valuation report or opinion for

Economic valuation justified repair diseases, deficiencies amendment, etc., as an inseparable part of an expert opinion, which complements. Considering a maximum of six items valued with or without decomposition.

225,59 €
RE0156u

Further recognition or inspection (distance <20 km)

Further recognition or inspection of buildings, land, plots, urban development, etc., even going to a maximum distance of 20 km.

212,96 €