CODEUDESCRIPTIONPRICE
RE0556u

Actions under construction external control energy certification (1 UI)

Monitoring and control of external certification of energy efficiency in the execution phase of work, for checking a building finished first inspection unit, according to the document Popularity DRD 15/06 "criteria technical control external certification of energy efficiency of new buildings, "consisting of the external control program, record promoter compliance with that program prior to the start of the work, external control during the course of the execution of the work, identifying data Late work (DFO), the detection of deviations from the DEC and the issue of the external audit report, including, in If deviations from the grade calculation using the same calculation tool. Includes travel and visits.

788,59 €
RE0555u

Preliminary external control energy certification (1 UI)

Monitoring and control of external certification of energy efficiency in preliminary stage, for the verification of the technical documentation for a building project with the first inspection unit, according to the document Popularity DRD 06 / 15 "technical criteria for external control of the certification of energy efficiency of new buildings," consisting of the identification data contained in the files of the tool used for calculating the energy certification project , checking their consistency with the project execution or minimum documentation, preparation of a report by external control, where the initial data will be recorded particularized control (DIC) in an attachment called Initial Identification data control individual services for the building, as well as the conclusions on the status of energy efficiency and finally registration pursuant to promoter DIC mb the individual services. Includes the study of technical documentation.

278,98 €
RE0554u

Technical assistance for repair or refurbishment interior (1 UI)

Technical assistance for the execution of a specific repair or internal reform in a home or premises without attachment structure, facades and other elements common with the first intervention in inspection unit, consisting of planning, coordination and supervision the execution of works. Includes technical and administrative paperwork municipal, tours and travel.

556,11 €
RE0429u

Waste Management Coordination rehabilitation building (1 UI)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

421,63 €
RE0184u

Waste Management Coordination rehabilitation façade (1 UI)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or local intervention in the first inspection unit, according with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

357,85 €
RE0295u

Waste Management Coordination repair construction element (1 UI)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the repair of an item constructive intervention in the first inspection unit in accordance with the established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

272,61 €
RE0434u

Occupational Safety and Health Coordination Building renovation (1 UI)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

675,27 €
RE0183u

Health and Safety Coordination rehabilitation façade (1 UI)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the rehabilitation of a building facade house, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

370,25 €
RE0269u

Health and Safety Coordination repair construction element (1 UI)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the repair of an item constructive intervention in the first inspection unit, in accordance with s 'established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

363,43 €
RE0442u

Execution rehabilitation (1 UI)

Execution of the works described in implementation of rehabilitation project for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

985,57 €
RE0268u

Execution repair construction element (1 UI)

Execution of the works described in implementation plan for the repair of an item constructive intervention in the first inspection unit. Includes visits to work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and emission certificate end of work.

374,28 €
RE0267u

Project management in repair construction element (1 UI)

Management works described in implementation plan for the repair of an item constructive intervention in the first inspection unit. Includes visits to work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the state of the works.

374,28 €
RE0416u

Director of the rehabilitation works (1 UI)

Construction management implementation plan described in rehabilitation for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

985,57 €
RE0447u

Project management reform and adaptation (1 UI)

Management of the works described in implementation plan for the reform and adaptation to functional and constructive intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

662,87 €
RE0181u

Project management rehabilitation cranes (1 UI)

Management of the works described in the implementation plan of rehabilitation cranes intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

662,87 €
RE0270u

Project management in repair construction element (1 UI)

Management of the works described in implementation plan for the repair of an item constructive intervention in the first inspection unit. Includes visits to work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, drawing up additional documents, control of construction certificates, emission certificate of work and final drafting of the final document of the state of the works.

544,15 €
RE0282u

Issuance of descriptive technical certificate for notarial registration (1 UI)

Issuance of descriptive technical certificate for registration of a notarial inspection unit, consisting of a visit to the property, review documentation and issuance of registration certificate coach. Even graphic documentation necessary drawn from the information provided by the client on the current state of the property.

386,86 €
RE0425u

Study Waste Management Rehabilitation (1 UI)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

319,96 €
RE0294u

Study on Waste Management in repair construction element (1 UI)

Writing Study Waste Management for the works described in the implementation plan for the repair of an item constructive intervention in the first inspection unit in accordance with the provisions of the Real Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

234,72 €
RE0180u

Waste Management Studio rehabilitation cranes (1 UI)

Writing Study Waste Management for the works described in the implementation plan of rehabilitation cranes intervention in the first inspection unit in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

319,96 €
RE0421u

Study of Safety and Health Rehabilitation (1 UI)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

396,17 €
RE0179u

Study of Safety and Health Rehabilitation cranes (1 UI)

Drafting the Study of Safety and Health for the work described in the project execution rehabilitation cranes intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97, 24 October, the Ministry of the Presidency.

396,17 €
RE0266u

Study on Safety and Health in repair construction element (1 UI)

Drafting the Study of Safety and Health for the work described in the implementation plan for the repair of an item constructive intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

247,11 €
RE0283u

Management application for aid for the execution of works

Management application for aid for the execution of works by technical or administrative staff, consisting of the collection and presentation of administrative documents required before the corresponding entity on behalf of the applicant .

670,46 €
RE0170u

Writing supplementary report IEC Building (1 UI)

Writing supplementary report Building (IEC) of the first inspection unit, which collects the information of the building written and graphic in order to detect, identify and qualify the damages (fissures, cracks, humidities. ..) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain necessary parameters for evaluating structural drafting a plan coves of the study results and the estimating the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based on the Guidelines for the Inspection and Evaluation complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

1.403,10 €
RE0414u

Writing supplementary report building IEC (20 IU)

Writing supplementary report Building (IEC), a building with 20 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 20 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

3.414,40 €
RE0163u

Writing assessment report building IEE (1 UI)

Writing Assessment Report of buildings (IEE) of the first inspection unit, which collects information on the building and its evaluation regarding their condition, according to the conditions of accessibility regulations and the degree of energy efficiency. Includes tours and travel, and visit the technical inspection of the property, making the certificate, entry in the register and obtain the energy efficiency label.

805,23 €
RE0516u

Preliminary Evaluation Report Writing IEP structure (1 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of the first inspection unit, which collects information from written and graphic building with the aim of analyzing the current state the structure of the building, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes visit to the technical inspection of the property.

907,64 €
RE0160u

Writing report and opinion (1 UI)

Writing report and opinion for the first inspection unit, consisting of the following written statement of the circumstances observed in recognition of the property, with technical explanations, economic, etc., and the opinion on the issue subject to consideration and justified on the basis of the report. Includes visits and travel and tour expert for the inspection of the property.

1.027,90 €
RE0151u

Editorial energy certification (1 UI)

Editorial energy certification for the first inspection unit in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for certifying the energy efficiency of buildings . Includes visit to the certifier for technical inspection of the property. inspection units, production certificate, registration in the register and obtain the energy efficiency label.

394,00 €
RE0446u

Writing project of reform and adaptation (1 UI)

Writing implementation plan for the reform and adaptation to functional and constructive intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description of solutions. Includes tours and travel, memory document specification, budget and plans.

1.012,37 €
RE0173u

Drafting building rehabilitation project (1 UI)

Writing rehabilitation project execution for the first inspection unit, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans.

4.321,65 €
RE0185u

Writing rehabilitation project cranes (1 UI)

Writing implementation plan for the rehabilitation of a facade with intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.012,37 €
RE0265u

Writing repair project construction element (1 UI)

Writing implementation plan for the repair of an item constructive intervention in the first inspection unit, consisting of technical visits for data collection, documentation of the current study and assessment of the deficiencies identified and description of repair construction element. Includes tours and travel, memory document specification, budget and plans.

1.012,37 €
RE0438u

Writing project management and renovation building (1 UI)

Writing project studies and project management for the renovation of a building with intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

8.105,83 €
RE0189u

Writing project management and rehabilitation cranes (1 UI)

Writing project studies and project management for the rehabilitation cranes intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the façade restoration project drafting, drafting Annex scaffolding, writing health and safety study, drafting of study on waste management, construction management, management of execution, coordination of health and safety, waste management and coordination. Includes visits and travel.

1.871,69 €
RE0296u

Editorial project management and repair construction element (1 UI)

Writing project studies and project management for the repair of an item constructive intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies and detected description of repair construction element, writing project and necessary annexes, writing health and safety study, drafting of study on waste management, direction of the works, coordination of health and safety coordination waste management. Includes visits to work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, drawing up additional documents, control of construction certificates, emission certificate of work and final drafting of the final document of the state of the works.

887,54 €
RE0152u

Renovation of municipal license of occupation of a dwelling

Renovation of municipal license of occupation of a property, according to municipal regulations. Includes visit to the house of the technical issue of technical certificate of compliance with the conditions of habitability, processing the affidavit of renewal and application fees, and obtaining the certificate of occupancy.

523,80 €
RE0182u

Appraisal and valuation of real estate building, land or premises (1 UI)

Appraisal and real estate valuation for the first inspection unit, consisting of the writing assessment report and supporting, independent or complementary to another report or opinion. Includes tours and travel, visit expert for inspection of the property, market research, analysis of current legislation on the date of valuation, preparation of graphic documentation necessary assessment and report writing.