RE0122 | u | Aids palette for the implementation of coves (10 IU)Aids palette for the execution and replacement of bays in a building with 10 units of inspection, consisting of the execution, painting and replacement of the lining of the affected area, size no greater than 0,50x0,50 m, without contribution of finishing materials. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: auxiliary to heights exceeding 7 meters or preparation of tasting (chopped coatings, opening holes in ceilings, etc.) or replacement of coatings and finishes. | 291,30 € |
RE0620 | u | Aids palette for the implementation of bays (two workers, half day)Aids palette for the implementation of coves and replacement with two equipment operators for half day or fraction, consisting of the execution, painting and replacement of the lining of the affected area, sized no larger than 0,50x0 50 m. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: tests or laboratory tests, auxiliary for heights greater than 7 m, or providing material finishes. | 270,08 € |
RE0553 | u | Technical assistance for the execution of a campaign of inlets (50 IU)Technical assistance for the execution of a campaign of beaches in a building or premises involving 50 inspection units, consisting of planning, coordination and supervision of the implementation of the coves and laboratory aids work for his replacement. Includes visits and travel. | 579,51 € |
RE0429 | u | Waste Management Coordination rehabilitation building (1 UI)Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste. | 486,83 € |
RE0430 | u | Waste Management Coordinator building rehabilitation (10 IU)Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste. | 577,25 € |
RE0431 | u | Waste Management Coordinator building rehabilitation (20 IU)Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste. | 618,23 € |
RE0432 | u | Waste Management Coordinator building rehabilitation (50 IU)Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste. | 697,85 € |
RE0434 | u | Occupational Safety and Health Coordination Building renovation (1 UI)Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency. | 702,07 € |
RE0435 | u | Health and Safety Coordination in building rehabilitation (10 IU)Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency. | 994,46 € |
RE0436 | u | Health and Safety Coordination in building rehabilitation (20 IU)Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency. | 1.126,90 € |
RE0437 | u | Health and Safety Coordination in building rehabilitation (50 IU)Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency. | 1.384,30 € |
RE0606 | u | Execution of construction of new construction (1 UI)Execution of the works described in implementation project of construction of new construction for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work. | 5.674,76 € |
RE0442 | u | Execution rehabilitation (1 UI)Execution of the works described in implementation of rehabilitation project for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work. | 965,38 € |
RE0443 | u | Execution rehabilitation (10 IU)Execution of the works described in implementation of rehabilitation project for a building or local intervention 10 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work. | 1.696,89 € |
RE0444 | u | Execution rehabilitation (20 IU)Execution of the works described in implementation of rehabilitation project for a building or local intervention 20 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work. | 2.073,31 € |
RE0445 | u | Execution rehabilitation (50 IU)Execution of the works described in implementation of rehabilitation project for a building or local intervention 50 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work. | 2.804,87 € |
RE0605 | u | Construction management of building new construction (1 UI)Management works described in implementation project of construction of new building or a building for local intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, one bimonthly meeting with the developer, control of construction certificates, issuing the final certificate of work and endorsed by the mandatory professional. | 5.674,76 € |
RE0416 | u | Director of the rehabilitation works (1 UI)Construction management implementation plan described in rehabilitation for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works. | 965,38 € |
RE0417 | u | Director of the rehabilitation works (10 IU)Management works described in implementation plan for a building or local intervention 10 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works. | 1.696,89 € |
RE0418 | u | Director of the rehabilitation works (20 IU)Management works described in implementation plan for a building or local intervention 20 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works. | 2.073,31 € |
RE0419 | u | Director of the rehabilitation works (50 IU)Management works described in implementation plan for a building or local intervention 50 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works. | 2.804,87 € |
RE0425 | u | Study Waste Management Rehabilitation (1 UI)Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste. | 510,00 € |
RE0426 | u | Study on Waste Management in rehabilitation (10 IU)Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 10 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste. | 607,38 € |
RE0427 | u | Study on Waste Management in rehabilitation (20 IU)Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 20 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste. | 651,51 € |
RE0428 | u | Study on Waste Management in rehabilitation (50 IU)Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 50 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste. | 737,24 € |
RE0421 | u | Study of Safety and Health Rehabilitation (1 UI)Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency. | 574,67 € |
RE0422 | u | Study on Safety and Health in rehabilitation (10 IU)Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency. | 709,04 € |
RE0423 | u | Study on Safety and Health in rehabilitation (20 IU)Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency. | 769,91 € |
RE0424 | u | Study on Safety and Health in rehabilitation (50 IU)Drafting the Study of Safety and Health for the work described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency. | 888,20 € |
RE0533 | u | Implementation plan coves and tests in residential building (10 IU)Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 10 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of the building: | 14.283,91 € |
RE0534 | u | Implementation plan coves and tests in residential building (20 IU)Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 20 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 8 units of inspection for each inspection area of the building: | 14.283,91 € |
RE0535 | u | Implementation plan coves and tests in residential building (50 IU)Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 50 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 16 units of inspection for each inspection area of the building: | 19.007,03 € |
RE0173 | u | Drafting building rehabilitation project (1 UI)Writing rehabilitation project execution for the first inspection unit, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans. | 4.386,71 € |
RE0171 | u | Drafting building rehabilitation project (10 IU)Writing implementation plan for building restoration or local inspection with 10 units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 10 IU). | 7.446,32 € |
RE0172 | u | Drafting building rehabilitation project (20 IU)Writing implementation plan for a building renovation or 20 local inspection units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 20 IU). | 8.555,38 € |
RE0168 | u | Drafting building rehabilitation project (50 IU)Writing implementation plan for a building renovation or 50 local inspection units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 30 IU). | 13.708,19 € |
RE0438 | u | Writing project management and renovation building (1 UI)Writing project studies and project management for the renovation of a building with intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel. | 8.591,04 € |
RE0439 | u | Writing project management and rehabilitation of building (10 IU)Writing project studies and project management for the renovation of a building with 10 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel. | 13.728,23 € |
RE0440 | u | Writing project management and rehabilitation of building (20 IU)Writing project studies and project management for the renovation of a building with 20 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel. | 15.868,54 € |
RE0441 | u | Writing project management and rehabilitation of building (50 IU)Writing project studies and project management for the renovation of a building with 50 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel. | 23.025,52 € |
RE0289 | u | Writing project execution gas installation (20 IU)Writing project execution gas installation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans. | 1.134,72 € |
RE0286 | u | Editorial electricity installation project execution (20 IU)Writing project execution installation of electricity for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and electrotechnical Regulation for low voltage REBT (RD 842/2002). Includes memory document specification, budget and plans. | 1.221,71 € |
RE0288 | u | Writing plumbing installation project execution (20 IU)Writing project execution plumbing and sanitation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans. | 786,75 € |
RE0290 | u | Editorial fire protection installation project execution (20 IU)Writing project execution install fire protection for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans. | 670,74 € |
RE0287 | u | Writing project execution telecommunications installation (20 IU)Writing project execution installation of telecommunications services for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and the Rules governing the common telecommunications infrastructure for access to telecommunication services inside buildings (Royal Decree 346/2011). Includes memory document specification, budget and plans. | 1.076,71 € |
RE0291 | u | Drafting implementation plan development (20 IU)Writing project development and implementation of urban regeneration to an area linked to a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans. | 1.518,52 € |
RE0285 | u | Writing project installation thermal energy (20 IU)Writing project execution installation of thermal energy for a building or local intervention 20 inspection units, according to the provisions of the Technical Building Code CTE ( RD 314/2006) and the Regulation of Thermal Installations in Buildings RITE (RD 1027/2007). Includes memory document specification, budget and plans. | 1.366,69 € |