PR09 | Comprehensive rehabilitation rate

CODEUDESCRIPTIONPRICE
RE0122u

Aids palette for the execution of tasting (20 IU)

Aid for the replacement of masonry tasting executed in a building with 20 units of inspection, involving the replacement of siding and paint on the affected area, size no greater than 0,50x0,50 m, without providing materials 'finished. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: auxiliary to heights exceeding 7 meters or preparation of tasting (chopped coatings, opening holes in ceilings, etc.) or unique siding replacement.

858,47 €
RE0553u

Technical assistance for the execution of a campaign of inlets (50 IU)

Technical assistance for the execution of a campaign in a building with 50 bays inspection units, consisting of planning, coordination and supervision of the implementation of the coves laboratory work and aid for his replacement. Includes shift a maximum distance of 20 km.

595,35 €
RE0429u

Waste Management Coordination comprehensive rehabilitation (1 UI)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the project implementation of comprehensive rehabilitation for the first inspection unit in accordance with the provisions of the Real Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

309,89 €
RE0430u

Waste Management Coordination comprehensive rehabilitation (10 IU)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 10, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

383,56 €
RE0431u

Waste Management Coordination comprehensive rehabilitation (20 IU)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 20, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

416,94 €
RE0432u

Waste Management Coordination comprehensive rehabilitation (50 IU)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 50, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

481,79 €
RE0434u

Health and Safety Coordination comprehensive rehabilitation (1 UI)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the project implementation of comprehensive rehabilitation for the first inspection unit, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

654,02 €
RE0435u

Health and Safety Coordination comprehensive rehabilitation (10 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or building with 10 local inspection units, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

987,73 €
RE0436u

Health and Safety Coordination comprehensive rehabilitation (20 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or building with 20 local inspection units, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.138,88 €
RE0437u

Health and Safety Coordination comprehensive rehabilitation (50 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or building with 50 local inspection units, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.432,66 €
RE0442u

Execution of comprehensive rehabilitation (1 UI)

Execution of the works carried out in execution of comprehensive rehabilitation project for the first inspection unit. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

954,54 €
RE0443u

Execution of comprehensive rehabilitation (10 IU)

Execution of the works carried out in execution of comprehensive rehabilitation project for a building with 10 units or local inspection. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

1.762,05 €
RE0444u

Execution of comprehensive rehabilitation (20 IU)

Execution of the works carried out in execution of comprehensive rehabilitation project for a building with 20 units or local inspection. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.153,03 €
RE0445u

Execution of comprehensive rehabilitation (50 IU)

Execution of the works carried out in execution of comprehensive rehabilitation project for a building with 50 units or local inspection. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.912,95 €
RE0416u

Construction management of comprehensive rehabilitation (1 UI)

Construction management developed in project implementation of comprehensive rehabilitation for the first inspection unit. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, issuing the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

954,54 €
RE0417u

Construction management of comprehensive rehabilitation (10 IU)

Construction management in developed implementation plan for building 10 units or local inspection. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, issuing the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

1.762,05 €
RE0418u

Construction management of comprehensive rehabilitation (20 IU)

Construction management in developed implementation plan for a building or local inspection units 20. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, issuing the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

2.153,03 €
RE0419u

Construction management of comprehensive rehabilitation (50 IU)

Construction management in developed implementation plan for a building or local inspection units 50. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, issuing the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

2.912,95 €
RE0425u

Study Waste Management comprehensive rehabilitation (1 UI)

Work relating to the drafting of the Study of Waste Management for the works carried out in the project implementation of comprehensive rehabilitation for the first inspection unit in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

309,89 €
RE0426u

Study Waste Management comprehensive rehabilitation (10 IU)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 10, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

383,56 €
RE0427u

Study Waste Management comprehensive rehabilitation (20 IU)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 20, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

416,94 €
RE0428u

Study Waste Management comprehensive rehabilitation (50 IU)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 50, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

481,79 €
RE0421u

Health and Safety Study of comprehensive rehabilitation (1 UI)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the project implementation of comprehensive rehabilitation for the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

383,70 €
RE0422u

Health and Safety Study of comprehensive rehabilitation (10 IU)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 10, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

499,59 €
RE0423u

Health and Safety Study of comprehensive rehabilitation (20 IU)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 20, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

552,07 €
RE0424u

Health and Safety Study of comprehensive rehabilitation (50 IU)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 50, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

654,08 €
RE0533u

Implementation plan coves and tests in residential building (10 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 10 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of ​​the building:

14.214,77 €
RE0534u

Implementation plan coves and tests in residential building (20 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 20 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 8 units of inspection for each inspection area of ​​the building:

14.214,77 €
RE0535u

Implementation plan coves and tests in residential building (50 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 50 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 16 units of inspection for each inspection area of ​​the building:

18.953,48 €
RE0438u

Fees integral rehabilitation technicians (1 UI)

Technical work for the complete renovation of the first inspection unit. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, construction management, performance management, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

8.041,03 €
RE0439u

Fees integral rehabilitation technicians (10 IU)

Technical work for the complete renovation of a building with 10 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, construction management, performance management, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

13.662,99 €
RE0440u

Fees integral rehabilitation technicians (20 IU)

Technical work for the complete renovation of a building with 20 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, construction management, performance management, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

16.474,08 €
RE0441u

Fees integral rehabilitation technicians (50 IU)

Technical work for the complete renovation of a building with 50 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, construction management, performance management, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

21.632,04 €
RE0286u

Writing project execution installation of electricity (20 IU)

Writing project execution installation of electricity for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314/2006) and electrotechnical Regulation for low voltage REBT (RD 842/2002). Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.279,52 €
RE0288u

Writing project execution plumbing and sanitation (20 IU)

Writing project execution plumbing and sanitation for a building or local inspection units 20, in accordance with the provisions of the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

783,09 €
RE0289u

Writing project execution gas installation (20 IU)

Writing project execution gas installation for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314 / 2006) and specific regulations. Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.180,23 €
RE0290u

Writing project execution install fire protection (20 IU)

Writing project execution install fire protection for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

650,69 €
RE0287u

Writing project execution installation of telecommunications services (20 IU)

Writing project execution installation of telecommunications services for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314/2006) and the Rules governing the common telecommunications infrastructure for access to telecommunication services inside buildings (Royal Decree 346/2011). Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.114,02 €
RE0291u

Writing project development and implementation of urban regeneration (20 IU)

Writing project development and implementation of urban regeneration to an area linked to a building or local inspection units 20, in accordance with the provisions of the Technical Building Code CTE ( RD 314/2006) and specific regulations. Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.612,56 €
RE0285u

Writing project to install thermal energy (20 IU)

Writing project execution installation of thermal energy for a building with 20 units or local inspection in accordance with the provisions of the Technical Building Code CTE (RD 314 / 2006) and the Regulation of Thermal Installations in Buildings RITE (RD 1027/2007). Includes shift a maximum distance of 20 km, memory document specification, budget and plans.

1.444,98 €
RE0173u

Drafting building rehabilitation project (1 UI)

Writing implementation plan for the first inspection unit, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and approach of the work aimed at repairing pathologies detected in structure, roofing, façades and facilities. Includes shift a maximum distance of 20 km, the expert visit for inspection of the property, the report document specification, budget and plans.

4.474,45 €
RE0171u

Drafting building rehabilitation project (10 IU)

Writing implementation plan for a building with 10 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes shift a maximum distance of 20 km, the expert visit for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 10 IU).

7.884,46 €
RE0172u

Drafting building rehabilitation project (20 IU)

Writing implementation plan for a building with 20 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes shift a maximum distance of 20 km, the expert visit for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 20 IU).

9.643,19 €
RE0168u

Drafting building rehabilitation project (50 IU)

Writing implementation plan for a building with 50 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes shift a maximum distance of 20 km, the expert visit for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 30 IU).

12.755,82 €