PR09 | Comprehensive rehabilitation rate

CODEUDESCRIPTIONPRICE
RE0122u

Aids palette for the implementation of coves (20 IU)

Aid for the replacement pallet bays executed in a building with 20 units of inspection, involving the replacement of siding and paint on the affected area, size no greater than 0,50x0,50 m, without providing materials 'finished. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: auxiliary to heights exceeding 7 meters or preparation of tasting (chopped coatings, opening holes in ceilings, etc.) or unique siding replacement.

824,19 €
RE0553u

Technical assistance for the execution of a campaign of inlets (50 IU)

Technical assistance for the execution of a campaign of beaches in a building or premises involving 50 inspection units, consisting of planning, coordination and supervision of the implementation of the coves and laboratory aids work for his replacement. Includes visits and travel.

698,40 €
RE0429u

Waste Management Coordination rehabilitation building (1 UI)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

392,06 €
RE0430u

Waste Management Coordinator building rehabilitation (10 IU)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

491,14 €
RE0431u

Waste Management Coordinator building rehabilitation (20 IU)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

536,04 €
RE0432u

Waste Management Coordinator building rehabilitation (50 IU)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

623,28 €
RE0434u

Occupational Safety and Health Coordination Building renovation (1 UI)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

627,90 €
RE0435u

Health and Safety Coordination in building rehabilitation (10 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

948,28 €
RE0436u

Health and Safety Coordination in building rehabilitation (20 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.093,40 €
RE0437u

Health and Safety Coordination in building rehabilitation (50 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.375,45 €
RE0442u

Execution rehabilitation (1 UI)

Execution of the works described in implementation of rehabilitation project for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

916,43 €
RE0443u

Execution rehabilitation (10 IU)

Execution of the works described in implementation of rehabilitation project for a building or local intervention 10 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

1.691,69 €
RE0444u

Execution rehabilitation (20 IU)

Execution of the works described in implementation of rehabilitation project for a building or local intervention 20 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.067,05 €
RE0445u

Execution rehabilitation (50 IU)

Execution of the works described in implementation of rehabilitation project for a building or local intervention 50 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.796,63 €
RE0416u

Director of the rehabilitation works (1 UI)

Construction management implementation plan described in rehabilitation for a building or local intervention in the first inspection unit. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

916,43 €
RE0417u

Director of the rehabilitation works (10 IU)

Management works described in implementation plan for a building or local intervention 10 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

1.691,69 €
RE0418u

Director of the rehabilitation works (20 IU)

Management works described in implementation plan for a building or local intervention 20 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

2.067,05 €
RE0419u

Director of the rehabilitation works (50 IU)

Management works described in implementation plan for a building or local intervention 50 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

2.796,63 €
RE0425u

Study Waste Management Rehabilitation (1 UI)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

297,51 €
RE0426u

Study on Waste Management in rehabilitation (10 IU)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 10 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

368,24 €
RE0427u

Study on Waste Management in rehabilitation (20 IU)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 20 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

400,29 €
RE0428u

Study on Waste Management in rehabilitation (50 IU)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 50 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

462,55 €
RE0421u

Study of Safety and Health Rehabilitation (1 UI)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

368,38 €
RE0422u

Study on Safety and Health in rehabilitation (10 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

479,64 €
RE0423u

Study on Safety and Health in rehabilitation (20 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

530,03 €
RE0424u

Study on Safety and Health in rehabilitation (50 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

627,96 €
RE0533u

Implementation plan coves and tests in residential building (10 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 10 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of ​​the building:

13.900,80 €
RE0534u

Implementation plan coves and tests in residential building (20 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 20 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 8 units of inspection for each inspection area of ​​the building:

13.900,80 €
RE0535u

Implementation plan coves and tests in residential building (50 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 50 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 16 units of inspection for each inspection area of ​​the building:

18.450,28 €
RE0173u

Drafting building rehabilitation project (1 UI)

Writing rehabilitation project execution for the first inspection unit, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans.

4.018,48 €
RE0171u

Drafting building rehabilitation project (10 IU)

Writing implementation plan for building restoration or local inspection with 10 units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 10 IU).

6.927,51 €
RE0172u

Drafting building rehabilitation project (20 IU)

Writing implementation plan for a building renovation or 20 local inspection units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 20 IU).

8.450,76 €
RE0168u

Drafting building rehabilitation project (50 IU)

Writing implementation plan for a building renovation or 50 local inspection units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 30 IU).

11.256,77 €
RE0438u

Writing project management and renovation building (1 UI)

Writing project studies and project management for the renovation of a building with intervention in the first inspection unit, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

7.537,19 €
RE0439u

Writing project management and rehabilitation of building (10 IU)

Writing project studies and project management for the renovation of a building with 10 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

12.598,19 €
RE0440u

Writing project management and rehabilitation of building (20 IU)

Writing project studies and project management for the renovation of a building with 20 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

15.144,62 €
RE0441u

Writing project management and rehabilitation of building (50 IU)

Writing project studies and project management for the renovation of a building with 50 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

19.939,27 €
RE0289u

Writing project execution gas installation (20 IU)

Writing project execution gas installation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

1.101,97 €
RE0286u

Editorial electricity installation project execution (20 IU)

Writing project execution installation of electricity for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and electrotechnical Regulation for low voltage REBT (RD 842/2002). Includes memory document specification, budget and plans.

1.197,29 €
RE0288u

Writing plumbing installation project execution (20 IU)

Writing project execution plumbing and sanitation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

720,69 €
RE0290u

Editorial fire protection installation project execution (20 IU)

Writing project execution install fire protection for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

593,57 €
RE0287u

Writing project execution telecommunications installation (20 IU)

Writing project execution installation of telecommunications services for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and the Rules governing the common telecommunications infrastructure for access to telecommunication services inside buildings (Royal Decree 346/2011). Includes memory document specification, budget and plans.

1.038,41 €
RE0291u

Drafting implementation plan development (20 IU)

Writing project development and implementation of urban regeneration to an area linked to a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

1.515,75 €
RE0285u

Writing project installation thermal energy (20 IU)

Writing project execution installation of thermal energy for a building or local intervention 20 inspection units, according to the provisions of the Technical Building Code CTE ( RD 314/2006) and the Regulation of Thermal Installations in Buildings RITE (RD 1027/2007). Includes memory document specification, budget and plans.

1.356,15 €