PR10 | 10 inspection fee units

CODEUDESCRIPTIONPRICE
RE0430u

Waste Management Coordinator building rehabilitation (10 IU)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

516,51 €
RE0404u

Waste Management Coordination rehabilitation façade (10 IU)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 10 inspection units, according with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

409,77 €
RE0435u

Health and Safety Coordination in building rehabilitation (10 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

997,26 €
RE0401u

Health and Safety Coordination rehabilitation façade (10 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 10 inspection units, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

758,65 €
RE0443u

Execution rehabilitation (10 IU)

Execution of the works described in implementation of rehabilitation project for a building or local intervention 10 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

1.779,06 €
RE0417u

Director of the rehabilitation works (10 IU)

Management works described in implementation plan for a building or local intervention 10 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

1.779,06 €
RE0193u

Project management rehabilitation cranes (10 IU)

Management of the works described in implementation project for rehabilitation of cranes in operation 10 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

981,49 €
RE0426u

Study on Waste Management in rehabilitation (10 IU)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 10 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

387,26 €
RE0164u

Waste Management Study for rehabilitation cranes (10 IU)

Writing Study Waste Management for the works described in the implementation plan of rehabilitation intervention cranes 10 inspection units, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

380,59 €
RE0422u

Study on Safety and Health in rehabilitation (10 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

504,41 €
RE0196u

Study of Safety and Health Rehabilitation cranes (10 IU)

Drafting the Study of Safety and Health for the work described in the project execution rehabilitation intervention cranes 10 inspection units, according to the provisions of Royal Decree 1627/97, 24 October, the Ministry of the Presidency.

481,40 €
RE0533u

Implementation plan coves and tests in residential building (10 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 10 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of ​​the building:

14.618,80 €
RE0413u

Writing supplementary report building IEC (10 IU)

Writing supplementary report Building (IEC), a building with 10 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 10 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

2.589,78 €
RE0410u

Writing assessment report building IEE (10 IU)

Writing Assessment Report of buildings (IEE), a building with 10 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes tours and travel, and visit the technical inspection of the property (with an intensity of inspection least six units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

1.317,35 €
RE0517u

Preliminary Evaluation Report Writing IEP structure (10 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of a building with 10 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes visit to the technical inspection of the property (with an intensity of inspection least six inspection units).

1.452,54 €
RE0165u

Editorial energy certification (10 IU)

Editorial energy certification for a building with 10 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes visit to the certifier for technical inspection of the property (with an intensity of inspection least six units of inspection, certification preparation, entry in the register and obtain the energy efficiency label.

839,84 €
RE0171u

Drafting building rehabilitation project (10 IU)

Writing implementation plan for building restoration or local inspection with 10 units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 10 IU).

7.285,33 €
RE0190u

Writing rehabilitation project cranes (10 IU)

Writing implementation plan for the rehabilitation of a facade with 10 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.246,84 €
RE0439u

Writing project management and rehabilitation of building (10 IU)

Writing project studies and project management for the renovation of a building with 10 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

13.248,91 €
RE0407u

Writing project management and rehabilitation cranes (10 IU)

Writing project studies and project management for the rehabilitation intervention cranes 10 inspection units, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the façade restoration project drafting, drafting Annex scaffolding, writing health and safety study, drafting of study on waste management, construction management, management of execution, coordination of health and safety, waste management and coordination. Includes visits and travel.

2.555,25 €