PR11 | Rate removing barriers

CODEUDESCRIPTIONPRICE
RE0468u

Waste Management Coordinator at removing barriers (one elevator)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building with one elevator or local, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

352,77 €
RE0469u

Waste Management Coordinator at removing barriers (two lifts)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building with two elevators or local, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

372,88 €
RE0470u

Waste Management Coordinator at removing barriers (3 lifts)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts, according to what is 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

381,21 €
RE0471u

Waste Management Coordinator at removing barriers (4 elevators)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with 4 lifts, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

387,60 €
RE0464u

Coordination safety and health at removing barriers (one elevator)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building with one elevator or local, in accordance with s' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

665,68 €
RE0465u

Coordination safety and health at removing barriers (two lifts)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building with two elevators or local, in accordance with s' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

895,78 €
RE0466u

Coordination safety and health at removing barriers (3 lifts)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

991,10 €
RE0467u

Coordination safety and health at removing barriers (4 elevators)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with 4 lifts, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.064,21 €
RE0452u

Project management in removing barriers (one elevator)

Management of the works described in the implementation plan for the elimination of architectural barriers in a building with one or local elevator. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

937,95 €
RE0453u

Project management in removing barriers (two lifts)

Management of the works described in the implementation plan for the elimination of architectural barriers in a building or premises with two lifts. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

1.214,04 €
RE0454u

Project management in removing barriers (3 lifts)

Management of the works described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

1.328,39 €
RE0455u

Project management in removing barriers (4 elevators)

Management of the works described in the implementation plan for the elimination of architectural barriers in a building or premises with four lifts. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

1.416,13 €
RE0460u

Study on Waste Management in removing barriers (one elevator)

Writing Study Waste Management for the works described in the implementation plan for the elimination of architectural barriers in a building with one elevator or local, in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

315,41 €
RE0461u

Study on Waste Management in removing barriers (two lifts)

Writing Study Waste Management for the works described in the implementation plan for the elimination of architectural barriers in a building with two elevators or local, in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

343,34 €
RE0462u

Study on Waste Management in removing barriers (3 lifts)

Writing Study Waste Management for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

354,91 €
RE0463u

Study on Waste Management in removing barriers (4 elevators)

Writing Study Waste Management for the works described in the implementation plan for the elimination of architectural barriers in a building or premises with 4 lifts, in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

363,78 €
RE0456u

Study of Health and Safety at removing barriers (one elevator)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building with one elevator or local, in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

436,38 €
RE0457u

Study of Health and Safety at removing barriers (two lifts)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building with two elevators or local, in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

555,67 €
RE0458u

Study of Health and Safety at removing barriers (3 lifts)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

605,07 €
RE0459u

Study of Health and Safety at removing barriers (4 elevators)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building or premises with 4 lifts, in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

643,01 €
RE0448u

Writing barrier removal project (one elevator)

Writing implementation plan for the elimination of architectural barriers in a building with one elevator, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description solution for the removal of architectural barriers. Includes tours and travel, memory document specification, budget and plans.

997,99 €
RE0449u

Writing project to eliminate barriers (two lifts)

Writing implementation plan for the elimination of architectural barriers in a building with two elevators, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description solution for the removal of architectural barriers. Includes tours and travel, memory document specification, budget and plans.

1.429,55 €
RE0450u

Writing Project removing barriers (3 lifts)

Writing implementation plan for the elimination of architectural barriers in a building with three lifts, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description solution for the removal of architectural barriers. Includes tours and travel, memory document specification, budget and plans.

1.612,37 €
RE0451u

Writing project to eliminate barriers (4 elevators)

Writing implementation plan for the elimination of architectural barriers in a building with 4 lifts, consisting of technical visits for data collection, the current uprising, study and assessment of existing needs and description solution for the removal of architectural barriers. Includes tours and travel, memory document specification, budget and plans.

1.762,45 €
RE0472u

Writing and project management in removing barriers (1 elevators)

Writing project studies and project management for the removal of architectural barriers in a building with one elevator, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the removal of architectural barriers, rehabilitation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, direction of the works, coordination coordination of health and safety and waste management. Includes visits and travel.

3.706,17 €
RE0473u

Writing and project management in removing barriers (two lifts)

Writing project studies and project management for the removal of architectural barriers in a building with two elevators, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the removal of architectural barriers, rehabilitation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, direction of the works, coordination coordination of health and safety and waste management. Includes visits and travel.

4.811,25 €
RE0474u

Writing and project management in removing barriers (3 lifts)

Writing project studies and project management for the removal of architectural barriers in a building with three lifts, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the removal of architectural barriers, rehabilitation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, direction of the works, coordination coordination of health and safety and waste management. Includes visits and travel.

5.273,05 €
RE0475u

Writing and project management in removing barriers (4 elevators)

Writing project studies and project management for the removal of architectural barriers in a building with 4 lifts, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the removal of architectural barriers, rehabilitation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, direction of the works, coordination coordination of health and safety and waste management. Includes visits and travel.

5.637,18 €