PR17 | Rate ECCE Organization for Quality Control in Construction

CODEUDESCRIPTIONPRICE
RE0652u

Actions under construction external control energy certification (1 UI)

Monitoring and control of external certification of energy efficiency in the execution phase of work, for checking a building finished first inspection unit, according to the document Popularity DRD 06/15 "criteria technical control external certification of energy efficiency of new buildings, "consisting of the external control program, record promoter compliance with that program prior to the start of the work, external control during the course of the execution of the work, identifying data Late work (DFO), the detection of deviations from the DEC and the issue of the external audit report, including, in If deviations from the grade calculation using the same calculation tool. Includes travel and visits.

561,44 €
RE0658u

Actions under construction external control energy certification (10 IU)

Monitoring and control of external certification of energy efficiency in the execution phase of work, for checking a finished building with 10 units of inspection in accordance with recognized document DRD 15/06 "criteria technical control external certification of energy efficiency of new buildings, "consisting of the external control program, record promoter compliance with that program prior to the start of the work, external control during the course of the execution of the work, identifying data Late work (DFO), the detection of deviations from the DEC and the issue of the external audit report, including, in If deviations from the grade calculation using the same calculation tool. Includes travel and visits.

1.670,51 €
RE0659u

Actions under construction external control energy certification (20 IU)

Monitoring and control of external certification of energy efficiency in the execution phase of work, for checking a finished building with 20 units of inspection in accordance with recognized document DRD 06/15 "criteria technical control external certification of energy efficiency of new buildings, "consisting of the external control program, record promoter compliance with that program prior to the start of the work, external control during the course of the execution of the work, identifying data Late work (DFO), the detection of deviations from the DEC and the issue of the external audit report, including, in If deviations from the grade calculation using the same calculation tool. Includes travel and visits.

2.172,85 €
RE0660u

Actions under construction external control energy certification (50 IU)

Monitoring and control of external certification of energy efficiency in the execution phase of work, for checking a finished building with 50 units of inspection in accordance with recognized document DRD 15/06 "criteria technical control external certification of energy efficiency of new buildings, "consisting of the external control program, record promoter compliance with that program prior to the start of the work, external control during the course of the execution of the work, identifying data Late work (DFO), the detection of deviations from the DEC and the issue of the external audit report, including, in If deviations from the grade calculation using the same calculation tool. Includes travel and visits.

3.149,27 €
RE0654u

Actions under construction external control of compliance with the CTE and other applicable regulations (1 UI)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations, under implementation work for the development of verification works building intervention in the first inspection unit, consisting of verifying the adequacy of the licensed works during his execution and to prepare the Technical Report of Compliance of finished works, the effect of the declaration or license of first occupation, in accordance with Law 5 / 2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia. Includes travel and visits.

1.162,58 €
RE0664u

Actions under construction external control of compliance with the CTE and other applicable regulations (10 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations, under implementation work for the development of the verification work of building with 10 units in operation inspection consistent verifying the adequacy of the licensed works during his execution and to prepare the Technical Report of Compliance of finished works, the effect of the declaration or license of first occupation, in accordance with Law 5 / 2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia. Includes travel and visits.

2.081,63 €
RE0665u

Actions under construction external control of compliance with the CTE and other applicable regulations (20 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations, under implementation work for the development of the verification work of building with 20 units in operation inspection consistent verifying the adequacy of the licensed works during his execution and to prepare the Technical Report of Compliance of finished works, the effect of the declaration or license of first occupation, in accordance with Law 5 / 2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia. Includes travel and visits.

2.497,91 €
RE0666u

Actions under construction external control of compliance with the CTE and other applicable regulations (50 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations, under implementation work for the development of the verification work of building with 50 units in operation inspection consistent verifying the adequacy of the licensed works during his execution and to prepare the Technical Report of Compliance of finished works, the effect of the declaration or license of first occupation, in accordance with Law 5 / 2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia. Includes travel and visits.

3.307,04 €
RE0651u

Preliminary external control energy certification (1 UI)

Monitoring and control of external certification of energy efficiency in preliminary stage, for the verification of the technical documentation for a building project with the first inspection unit, according to the document Popularity DRD 06 / 15 "technical criteria for external control of the certification of energy efficiency of new buildings," consisting of the identification data contained in the files of the tool used for calculating the energy certification project , checking their consistency with the project execution or minimum documentation, preparation of a report by external control, where the initial data will be recorded particularized control (DIC) in an attachment called Initial Identification data control individual services for the building, as well as the conclusions on the status of energy efficiency and finally registration pursuant to promoter DIC mb the individual services.

278,15 €
RE0655u

Preliminary external control energy certification (10 IU)

Monitoring and control of external certification of energy efficiency in preliminary stage, for the verification of the technical documentation for a building project with 10 units of inspection in accordance with recognized document DRD 06 / 15 "technical criteria for external control of the certification of energy efficiency of new buildings," consisting of the identification data contained in the files of the tool used for calculating the energy certification project , checking their consistency with the project execution or minimum documentation, preparation of a report by external control, where the initial data will be recorded particularized control (DIC) in an attachment called Initial Identification data control individual services for the building, as well as the conclusions on the status of energy efficiency and finally registration pursuant promoter DIC with individual services.

1.103,93 €
RE0656u

Preliminary external control energy certification (20 IU)

Monitoring and control of the external certification of energy efficiency in preliminary stage, for the verification of the technical documentation for a building project with 20 units of inspection in accordance with recognized document DRD 06 / 15 "technical criteria for external control of the certification of energy efficiency of new buildings," consisting of the identification data contained in the files of the tool used for calculating the energy certification project , checking their consistency with the project execution or minimum documentation, preparation of a report by external control, where the initial data will be recorded particularized control (DIC) in an attachment called Initial Identification data control individual services for the building, as well as the conclusions on the status of energy efficiency and finally registration pursuant promoter DIC with individual services.

1.477,95 €
RE0657u

Preliminary external control energy certification (50 IU)

Monitoring and control of external certification of energy efficiency in preliminary stage, for the verification of the technical documentation for a building project with 50 units of inspection in accordance with recognized document DRD 06 / 15 "technical criteria for external control of the certification of energy efficiency of new buildings," consisting of the identification data contained in the files of the tool used for calculating the energy certification project , checking their consistency with the project execution or minimum documentation, preparation of a report by external control, where the initial data will be recorded particularized control (DIC) in an attachment called Initial Identification data control individual services for the building, as well as the conclusions on the status of energy efficiency and finally registration pursuant promoter DIC with individual services.

2.204,96 €
RE0653u

Preliminary external audit of compliance with the CTE and other applicable regulations (1 UI)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations in preliminary stage, for the verification of the technical documentation for a building project with intervention in the first inspection unit, consisting check integrity requirements documents, adequacy and suitability of projects and documents relating to the license or declaration, required by applicable law, proof that the projects and technical documentation justifying compliance with the provisions and regulations applicable prepare a report external control, in accordance with Law 5/2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia.

784,85 €
RE0661u

Preliminary external audit of compliance with the CTE and other applicable regulations (10 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations in preliminary stage, for the verification of the technical documentation for a building project with 10 units in operation inspection consisting check integrity requirements documents, adequacy and suitability of projects and documents relating to the license or declaration, required by applicable law, proof that the projects and technical documentation justifying compliance with the provisions and regulations applicable prepare a report external control, in accordance with Law 5/2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia.

1.420,62 €
RE0662u

Preliminary external audit of compliance with the CTE and other applicable regulations (20 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations in preliminary stage, for the verification of the technical documentation for a building project with 20 units in operation inspection consisting check integrity requirements documents, adequacy and suitability of projects and documents relating to the license or declaration, required by applicable law, proof that the projects and technical documentation justifying compliance with the provisions and regulations applicable prepare a report external control, in accordance with Law 5/2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia.

1.708,57 €
RE0663u

Preliminary external audit of compliance with the CTE and other applicable regulations (50 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations in preliminary stage, for the verification of the technical documentation for a building project with 50 units in operation inspection consisting check integrity requirements documents, adequacy and suitability of projects and documents relating to the license or declaration, required by applicable law, proof that the projects and technical documentation justifying compliance with the provisions and regulations applicable prepare a report external control, in accordance with Law 5/2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia.

2.268,30 €