PR20 | 20 Rate inspection units

CODEUDESCRIPTIONPRICE
RE0659u

Actions under construction external control energy certification (20 IU)

Monitoring and control of external certification of energy efficiency in the execution phase of work, for checking a finished building with 20 units of inspection in accordance with recognized document DRD 06/15 "criteria technical control external certification of energy efficiency of new buildings, "consisting of the external control program, record promoter compliance with that program prior to the start of the work, external control during the course of the execution of the work, identifying data Late work (DFO), the detection of deviations from the DEC and the issue of the external audit report, including, in If deviations from the grade calculation using the same calculation tool. Includes travel and visits.

2.173,10 €
RE0665u

Actions under construction external control of compliance with the CTE and other applicable regulations (20 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations, under implementation work for the development of the verification work of building with 20 units in operation inspection consistent verifying the adequacy of the licensed works during his execution and to prepare the Technical Report of Compliance of finished works, the effect of the declaration or license of first occupation, in accordance with Law 5 / 2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia. Includes travel and visits.

2.498,18 €
RE0656u

Preliminary external control energy certification (20 IU)

Monitoring and control of external certification of energy efficiency in preliminary stage, for the verification of the technical documentation for a building project with 20 units of inspection in accordance with recognized document DRD 06 / 15 "technical criteria for external control of the certification of energy efficiency of new buildings," consisting of the identification data contained in the files of the tool used for calculating the energy certification project , checking their consistency with the project execution or minimum documentation, preparation of a report by external control, where the initial data will be recorded particularized control (DIC) in an attachment called Initial Identification data control individual services for the building, as well as the conclusions on the status of energy efficiency and finally registration pursuant promoter DIC with individual services.

1.478,11 €
RE0662u

Preliminary external audit of compliance with the CTE and other applicable regulations (20 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations in preliminary stage, for the verification of the technical documentation for a building project with 20 units in operation inspection consisting check integrity requirements documents, adequacy and suitability of projects and documents relating to the license or declaration, required by applicable law, proof that the projects and technical documentation justifying compliance with the provisions and regulations applicable prepare a report external control, in accordance with Law 5/2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia.

1.708,76 €
RE0122u

Aids palette for the implementation of bays (two UI)

Aids palette for the execution and replacement of bays in a building with two inspection units, consisting of the execution of replacement and paint coating the affected area, size no greater than 0,50x0,50 m no contribution of finishing materials. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: auxiliary to heights exceeding 7 meters or preparation of tasting (chopped coatings, opening holes in ceilings, etc.) or replacement of coatings and finishes.

318,85 €
RE0431u

Waste Management Coordinator building rehabilitation (20 IU)

Waste Management Coordination according to the Waste Management Study prepared for the work described in the project execution for a building or rehabilitation involving 20 local inspection units, according to what 's established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

676,69 €
RE0405u

Waste Management Coordination rehabilitation façade (20 IU)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 20 inspection units, according with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

556,20 €
RE0436u

Health and Safety Coordination in building rehabilitation (20 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.233,47 €
RE0402u

Health and Safety Coordination rehabilitation façade (20 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 20 inspection units, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.032,48 €
RE0444u

Execution rehabilitation (20 IU)

Execution of the works described in implementation of rehabilitation project for a building or local intervention 20 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.269,38 €
RE0418u

Director of the rehabilitation works (20 IU)

Management works described in implementation plan for a building or local intervention 20 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

2.269,38 €
RE0194u

Project management rehabilitation cranes (20 IU)

Management of the works described in implementation project for rehabilitation of cranes in operation 20 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

1.697,24 €
RE0427u

Study on Waste Management in rehabilitation (20 IU)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 20 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

713,12 €
RE0423u

Study on Safety and Health in rehabilitation (20 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

842,72 €
RE0197u

Study of Safety and Health Rehabilitation cranes (20 IU)

Drafting the Study of Safety and Health for the work described in the project execution rehabilitation intervention cranes 20 inspection units, according to the provisions of Royal Decree 1627/97, 24 October, the Ministry of the Presidency.

810,98 €
RE0534u

Implementation plan coves and tests in residential building (20 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 20 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the criterion of technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 8 units of inspection for each inspection area of ​​the building:

15.634,72 €
RE0199u

Editorial Study Waste Management rehabilitation cranes (20 IU)

Writing Study Waste Management for the works described in the implementation plan of rehabilitation intervention cranes 20 inspection units, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

820,40 €
RE0411u

Writing Assessment Report of the Building IEEV.CV (20 IU)

Writing Assessment Report of the building of residential housing in the Valencian Community (IEEV.CV), a building with 20 units or local inspection, which describes the construction features of the common elements of an existing building, indicating their condition, their accessibility and energy efficiency, and pointing to construction deficiencies, functional, safety or habitability detected, in order to warn them and guidance on the actions necessary to maintain the proper condition of the building, as well as to improve its accessibility and energy efficiency. Includes travel and visit for technical inspection of the property (with a minimum intensity of inspection 10 inspection units), preparation of the report and its entry in the records, preparation of certificate energy efficiency and its registration in the corresponding register and obtain accreditation label.

1.728,87 €
RE0518u

Preliminary Evaluation Report Writing IEP structure (20 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of a building with 20 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes visit to the technical inspection of the property (with an intensity of at least 15 inspection inspection units).

1.545,43 €
RE0166u

Editorial energy certification (20 IU)

Editorial energy certification for a building with 20 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes visit to the certifier for technical inspection of the property (with a minimum intensity of inspection of 10 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label.

900,92 €
RE0172u

Drafting building rehabilitation project (20 IU)

Writing implementation plan for a building renovation or 20 local inspection units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 20 IU).

9.364,45 €
RE0191u

Writing rehabilitation project cranes (20 IU)

Writing implementation plan for the rehabilitation of a facade with 20 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all the maps necessary to be able to put into action the works.

1.612,74 €
RE0440u

Writing project management and rehabilitation of building (20 IU)

Writing project studies and project management for the renovation of a building with 20 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

17.369,20 €
RE0408u

Writing project management and rehabilitation cranes (20 IU)

Writing project studies and project management for the rehabilitation intervention cranes 20 inspection units, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the façade restoration project drafting, drafting Annex scaffolding, writing health and safety study, drafting of study on waste management, construction management, management of execution, coordination of health and safety, waste management and coordination. Includes visits and travel.

3.918,03 €
RE0289u

Writing project execution gas installation (20 IU)

Writing project execution gas installation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (DR 314/2006) and specific regulations. Includes memory document specification, budget and plans.

1.242,02 €
RE0286u

Editorial electricity installation project execution (20 IU)

Writing project execution installation of electricity for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and electrotechnical Regulation for low voltage REBT (RD 842/2002). Includes memory document specification, budget and plans.

1.337,25 €
RE0288u

Writing plumbing installation project execution (20 IU)

Writing project execution plumbing and sanitation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

861,15 €
RE0290u

Editorial fire protection installation project execution (20 IU)

Writing project execution install fire protection for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes memory document specification, budget and plans.

734,17 €
RE0287u

Writing project execution telecommunications installation (20 IU)

Writing project execution installation of telecommunications services for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and the Rules governing the common telecommunications infrastructure for access to telecommunication services inside buildings (Royal Decree 346/2011). Includes memory document specification, budget and plans.

1.178,53 €
RE0291u

Drafting implementation plan development (20 IU)

Writing project development and implementation of urban regeneration to an area linked to a building or premises involving 20 units of inspection in accordance with the provisions in the Technical Building Code CTE (Decree 314/2006) and specific regulations. Includes memory document specification, budget and plans.

1.662,13 €
RE0285u

Writing project installation thermal energy (20 IU)

Writing project execution installation of thermal energy for a building or local intervention 20 inspection units, according to the provisions of the Technical Building Code CTE ( RD 314/2006) and the Regulation of Thermal Installations in Buildings RITE (RD 1027/2007). Includes memory document specification, budget and plans.

1.495,94 €