PR50 | 50. Rate inspection

CODEUDESCRIPTIONPRICE
RE0660u

Actions under construction external control energy certification (50 IU)

Monitoring and control of external certification of energy efficiency in the execution phase of work, for checking a finished building with 50 units of inspection in accordance with recognized document DRD 15/06 "criteria technical control external certification of energy efficiency of new buildings, "consisting of the external control program, record promoter compliance with that program prior to the start of the work, external control during the course of the execution of the work, identifying data Late work (DFO), the detection of deviations from the DEC and the issue of the external audit report, including, in If deviations from the grade calculation using the same calculation tool. Includes travel and visits.

3.395,07 €
RE0666u

Actions under construction external control of compliance with the CTE and other applicable regulations (50 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations, under implementation work for the development of the verification work of building with 50 units in operation inspection consistent verifying the adequacy of the licensed works during his execution and to prepare the Technical Report of Compliance of finished works, the effect of the declaration or license of first occupation, in accordance with Law 5 / 2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia. Includes travel and visits.

3.565,15 €
RE0657u

Preliminary external control energy certification (50 IU)

Monitoring and control of external certification of energy efficiency in preliminary stage, for the verification of the technical documentation for a building project with 50 units of inspection in accordance with recognized document DRD 06 / 15 "technical criteria for external control of the certification of energy efficiency of new buildings," consisting of the identification data contained in the files of the tool used for calculating the energy certification project , checking their consistency with the project execution or minimum documentation, preparation of a report by external control, where the initial data will be recorded particularized control (DIC) in an attachment called Initial Identification data control individual services for the building, as well as the conclusions on the status of energy efficiency and finally registration pursuant promoter DIC with individual services.

2.377,06 €
RE0663u

Preliminary external audit of compliance with the CTE and other applicable regulations (50 IU)

Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations in preliminary stage, for the verification of the technical documentation for a building project with 50 units in operation inspection consisting check integrity requirements documents, adequacy and suitability of projects and documents relating to the license or declaration, required by applicable law, proof that the projects and technical documentation justifying compliance with the provisions and regulations applicable prepare a report external control, in accordance with Law 5/2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia.

2.445,34 €
RE0553u

Technical assistance for the execution of a campaign of inlets (50 IU)

Technical assistance for the execution of a campaign of beaches in a building or premises involving 50 inspection units, consisting of planning, coordination and supervision of the implementation of the coves and laboratory aids work for his replacement. Includes visits and travel.

683,74 €
RE0432u

Waste Management Coordinator building rehabilitation (50 IU)

Waste Management Coordination according to the Waste Management Study prepared for the works described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

823,36 €
RE0406u

Waste Management Coordination rehabilitation façade (50 IU)

Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 50 inspection units, according with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

653,49 €
RE0437u

Health and Safety Coordination in building rehabilitation (50 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.633,30 €
RE0403u

Health and Safety Coordination rehabilitation façade (50 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the rehabilitation of the facade of a building or premises involving 50 inspection units, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.470,41 €
RE0445u

Execution rehabilitation (50 IU)

Execution of the works described in implementation of rehabilitation project for a building or local intervention 50 inspection units. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

3.309,38 €
RE0419u

Director of the rehabilitation works (50 IU)

Management works described in implementation plan for a building or local intervention 50 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, issuance of final certificate of work and drafting of the final document of the project work, containing the final state of the works.

3.309,38 €
RE0195u

Project management rehabilitation cranes (50 IU)

Management of the works described in implementation project for rehabilitation of cranes in operation 50 inspection units. Includes: one weekly visit at work, drafting additional documents, control of construction certificates, certified emission end of the work and drafting of the final document of the project work, containing the final state of the works.

2.232,31 €
RE0428u

Study on Waste Management in rehabilitation (50 IU)

Writing Study Waste Management for the works described in the implementation plan for rehabilitation of a building or premises involving 50 units of inspection in accordance with the provisions of Royal Decree 105 / 2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

650,30 €
RE0424u

Study on Safety and Health in rehabilitation (50 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

828,40 €
RE0198u

Study of Safety and Health Rehabilitation cranes (50 IU)

Drafting the Study of Safety and Health for the work described in the project execution rehabilitation intervention cranes 50 inspection units, according to the provisions of Royal Decree 1627/97, 24 October, the Ministry of the Presidency.

993,02 €
RE0535u

Implementation plan coves and tests in residential building (50 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 50 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 16 units of inspection for each inspection area of ​​the building:

22.425,76 €
RE0200u

Editorial Study Waste Management rehabilitation cranes (50 IU)

Writing Study Waste Management for the works described in the implementation plan of rehabilitation intervention cranes 50 inspection units, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

1.051,84 €
RE0415u

Writing supplementary report building IEC (50 IU)

Writing supplementary report Building (IEC), a building with 50 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 30 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

5.241,35 €
RE0412u

Writing Assessment Report of the Building IEEV.CV (50 IU)

Writing Assessment Report of the building of residential housing in the Valencian Community (IEEV.CV), a building with 50 units or local inspection, which describes the construction features of the common elements of an existing building, indicating their condition, their accessibility and energy efficiency, and pointing to construction deficiencies, functional, safety or habitability detected, in order to warn them and guidance on the actions necessary to maintain the proper condition of the building, as well as to improve its accessibility and energy efficiency. Includes travel and visit for technical inspection of the property (with a minimum intensity of inspection 16 inspection units), preparation of the report and its entry in the records, preparation of certificate energy efficiency and its registration in the corresponding register and obtain accreditation label.

2.480,19 €
RE0538u

Preliminary Evaluation Report Writing IEP structure (50 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of a building with 50 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes visit to the technical inspection of the property (with a minimum intensity of inspection 23 inspection units).

2.203,92 €
RE0167u

Editorial energy certification (50 IU)

Editorial energy certification for a building with 50 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes visit to the certifier for technical inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label.

1.411,56 €
RE0168u

Drafting building rehabilitation project (50 IU)

Writing implementation plan for a building renovation or 50 local inspection units, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution for the repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 30 IU).

16.173,84 €
RE0192u

Writing rehabilitation project cranes (50 IU)

Writing implementation plan for the rehabilitation of a facade with 50 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.838,60 €
RE0441u

Writing project management and rehabilitation of building (50 IU)

Writing project studies and project management for the renovation of a building with 50 units in operation inspection, consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and description of the solution for the rehabilitation of the building renovation project drafting, drafting of the annexes required, drafting health and safety study, drafting of study on waste management, construction management, address execution, coordination of health and safety coordination and management of waste. Includes visits and travel.

26.727,95 €
RE0409u

Writing project management and rehabilitation cranes (50 IU)

Writing project studies and project management for the rehabilitation intervention cranes 50 inspection units, consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and description solution for the restoration of the façade restoration project drafting, drafting Annex scaffolding, writing health and safety study, drafting of study on waste management, construction management, management of execution, coordination of health and safety, waste management and coordination. Includes visits and travel.

4.943,80 €