PR50 | 50. Rate inspection

CODEUDESCRIPTIONPRICE
RE0553u

Technical assistance for the execution of a campaign of inlets (50 IU)

Technical assistance for the execution of a campaign in a building with 50 bays inspection units, consisting of planning, coordination and supervision of the implementation of the coves laboratory work and aid for his replacement. Includes shift a maximum distance of 20 km.

596,47 €
RE0406u

Waste Management Coordination facade rehabilitation (50 IU)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the rehabilitation of a building facade plurifamilar involving 50 units inspection in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

485,79 €
RE0432u

Waste Management Coordination comprehensive rehabilitation (50 IU)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 50, in accordance with s 'established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

482,70 €
RE0403u

Health and Safety Coordination rehabilitation façade (50 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the rehabilitation of plurifamilar facade of a building with 50 units in operation inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.277,50 €
RE0437u

Health and Safety Coordination comprehensive rehabilitation (50 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for a comprehensive rehabilitation or building with 50 local inspection units, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.435,35 €
RE0445u

Execution of comprehensive rehabilitation (50 IU)

Execution of the works carried out in execution of comprehensive rehabilitation project for a building with 50 units or local inspection. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and final certificate of emission of work.

2.918,43 €
RE0419u

Construction management of comprehensive rehabilitation (50 IU)

Construction management in developed implementation plan for a building or local inspection units 50. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, issuing the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

2.918,43 €
RE0195u

Project management rehabilitation cranes (50 IU)

Work for the location of the works carried out in execution project for the rehabilitation of plurifamilar facade of a building with 50 units in operation inspection. Includes: one weekly visit at work drafting of additional documents that may be required to detail any element of work, monitoring of work certifications, emission final certificate of work and drafting of the final document of the project work , containing the final state of the works.

1.414,90 €
RE0200u

Waste Management Studio rehabilitation cranes (50 IU)

Writing Study Waste Management for the works described in the implementation plan for the rehabilitation of plurifamilar facade of a building with 50 units in operation inspection, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

555,49 €
RE0428u

Study Waste Management comprehensive rehabilitation (50 IU)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 50, in accordance with the provisions Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

482,70 €
RE0198u

Study of Safety and Health Rehabilitation cranes (50 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan for the rehabilitation of plurifamilar facade of a building with 50 units in operation inspection, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

602,07 €
RE0424u

Health and Safety Study of comprehensive rehabilitation (50 IU)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for a comprehensive rehabilitation or local building inspection units 50, in accordance with the provisions Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

655,31 €
RE0535u

Implementation plan coves and tests in residential building (50 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 50 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 16 units of inspection for each inspection area of ​​the building:

18.989,14 €
RE0409u

Fee technical rehabilitation of cranes (50 IU)

Technical work for the restoration of a facade with 50 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the façade restoration project drafting, drafting Annex scaffolding writing study health and safety, preparation of study on waste management, construction management, performance management, coordination of health and safety, waste management and coordination. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

3.571,09 €
RE0441u

Fees integral rehabilitation technicians (50 IU)

Technical work for the complete renovation of a building with 50 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and assessment of the deficiencies identified and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting the necessary annexes, writing health and safety study, drafting of study on waste management, construction management, performance management, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

21.672,74 €
RE0415u

Writing supplementary report building IEC (50 IU)

Writing supplementary report Building (IEC), a building with 50 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 30 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

4.478,13 €
RE0412u

Writing assessment report building IEE (50 IU)

Writing Assessment Report of buildings (IEE), a building with 50 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtaining the energy efficiency label.

2.038,09 €
RE0167u

Editorial energy certification (50 IU)

Editorial energy certification for a building with 50 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes shift a maximum distance of 20 km, visit technical certifier for inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtaining the energy efficiency label.

1.464,52 €
RE0538u

Writing the evaluation report preliminary structure IEP (50 IU)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP), a building with 50 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes shift a maximum distance of 20 km, and visit the technical inspection of the property (with a minimum intensity of inspection 23 inspection units).

2.450,22 €
RE0168u

Drafting building rehabilitation project (50 IU)

Writing implementation plan for a building with 50 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes shift a maximum distance of 20 km, the expert visit for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 30 IU).

12.779,82 €
RE0192u

Writing rehabilitation project cranes (50 IU)

Writing implementation plan for the rehabilitation of a facade with 50 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes shift a maximum distance of 20 km, visit technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.616,07 €